Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number Days left in cont <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />110 -30 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />11-20-03 <br />Thursda <br />General Contractor. <br />Liner Contractor. <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sanqy silt <br />Cloudy 500 <br />Frank Dell -Era <br />nquipinent uunzea: <br />Water Truck 2-623 Cat Paddle wheel scrapers, Case Tractor with scraper box. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 12 Man crew <br />Wood Bros. continued to grade the operations layer utilizing the case tractor with scraper box and laser set- <br />up. Wood Bros. graded stockpile areas to drain to the appropriate down drains. Wood Bros. continued to <br />construct a berm with material from stockpile 2 around Module 1 for future use as operations material <br />Con J Franke on site running electrical conduit and cable. <br />Vector Engineering, Inc. CQA attended the weekly construction meeting. CQA observed grading of the <br />operations material. <br />Vector discussed with Wood Bros. LLSI will be on site tomorrow morning to start leak testing. LZ# 3's can lock lid was hit by a scraper and will <br />need to be repaired. <br />I A <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />