My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name: <br />Construction of 2 Landfill Modules - <br />Foothill Landfill <br />Location of Work: <br />Stockton Ca. <br />General Contractor <br />Wood Brothers <br />Mario Garza <br />Source and Description o <br />Brown sandy silt <br />Water Truck 2-623 Cat Paddle wheel <br />Vector Engineering <br />Daily Field Report <br />Client Or Manager Daily <br />County of San Joaquin <br />Owner's Or Client's Representative <br />Mike Carroll <br />Liner Contractor: <br />D&E Construction <br />Eric Downs/Victor Cassilas <br />Weather <br />Cloudy 49° <br />Backhoe. <br />Report Sequence Number. <br />111 <br />Date: Day <br />11-21-03 Fri <br />Project Engineer. <br />Bryan Fritzler <br />Other. <br />CQA Technician: <br />Frank Dell -Era <br />Days left in contract <br />-31 <br />By: <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 12 Man crew LLSI 2man crew <br />Wood Bros. continued to grade the stockpile areas to drain to the appropriate down drains. Wood bros. <br />continued to construct a berm with material from stockpile 2 around Module 1 for future use as operations <br />material utilizing 2 -623 scrapers. Wood bros removed the access ramp on the southern end of Module 1 and <br />replaced the ramp on the northern portion. Wood Bros. removed the broken down 623 Scraper, Case tractor <br />and D6LGP dozer from the floor area as they were repaired. <br />Con J Franke: pouring concrete for the light tower bases. J Franke imported from Concrete Inc, 6 yards of <br />mix #15 to construct 2 bases for the light bases at the leachate containment area. <br />*Leak Location on site with 4laborers from Wood bros. LLSI installed wire on the northeastern and southern <br />portions of Module 1. LLSI started actual testing leak testing @1330 thru 1900. <br />Vector Engineering, Inc. CQA observed leak testing of liner materials. CQA observed concrete placement <br />for light bases. <br />Vector discussed with Wood bros CQA will call Dennis Shamoon if any repairs are needed to be performed by D&E. <br />File Name: Foothill Landfill Prepared By Frank Dell -Era <br />Reviewed <br />
The URL can be used to link to this page
Your browser does not support the video tag.