Laserfiche WebLink
........y, ally p.vulcu,s anu tneir sowtlons): <br />Wood Brothers: 12 Man crew <br />Wood Bros. continued to construct a berm with material from stockpile 2 around Module 1 for future use as <br />operations material along the liner edges. Wood Bros started placing operations material along the outer edge <br />of Module 1 when LLSI had confirmed no leaks were found utilizing 2 —D6 dozers with laborers watching <br />the plywood and liner. Wood Bros. had 2 laborers and a water truck with driver help LLSI. The water truck <br />continued to maintain moisture in the operations material as testing progressed. <br />LLSI completed leak testing on Module 1 with no repairs located. LLSI rechecked calibration on equipment <br />prior to completion to verify equipment is in working order. Equipment is in proper working condition. <br />Vector Engineering, Inc. CQA observed Leak testing and placement of operations material. <br />Vector discussed with Wood Bros no operations material can be placed along the liner edges until LLSI has completed testing Module I <br />File Name: Foothill Landfill Prepared By Frank Dell -Era Reviewed <br />