Laserfiche WebLink
- •------ —"----e ---- `•'-J) •+•y pevveo-- — ufCir Solutions): <br />Wood Brothers: 7 Man crew <br />Wood Bros. continued to place plywood and push operations material on the outer edge of Module 1 <br />utilizing 2 D6 dozers, 623 scraper and 4 laborers. Wood bros continued to haul material from stockpile 2 for <br />operations material. <br />Con J Franke continued to run electrical conduit at the leachate containment pad area. <br />Vector Engineering, Inc. CQA observed placement of plywood and operations layer material along the liner <br />edge. <br />*Vector discussed with Wood Bros. Surveyors are going to be scheduled for Tuesday ? <br />File Name: Foothill Landfill Prepared By Frank Dell Era Reviewed Bv: <br />