My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Foothill Sanitary Landfill — Module 1 December 2003 <br />County of San Joaquin Job No. 031602-00.02 <br />5.0 GEOSYNTHETICS CONSTRUCTION <br />5.1 General Description of Activities <br />The geosynthetics components of Module 1 consisted of geosynthetic clay liner (GCL), <br />60 -mil HDPE geomembrane, geocomposite, and geotextile. The installation and <br />associated CQA provided for each of these components are discussed within the <br />following sections. <br />5.2 Geosynthetic Clay Liner (GCL) <br />The GCL used in the construction of Module 1 was manufactured by GSE. The type of <br />GCL material utilized was Bentofix NWL35. Bentofix NWL35 consists of granular <br />bentonite encapsulated by two non -woven geotextiles. <br />5.2.1 GCL Manufacture and Delivery <br />5.2.1.1 Receiving Inspection <br />Upon arrival by truck shipment, Vector's CQA Monitor conducted the receiving <br />inspection that include labeling, transportation and handling, storage, and inventory as <br />discuss in the following. <br />The unloading and storage of the GCL rolls were observed by Vector's CQA Monitors. <br />Each roll of GCL was logged in by roll number. Information regarding the roll number, <br />lot, batch, laboratory testing log, and pass/fail of the sheet was recorded. A copy of the <br />log of GCL received and the manufacturer's data have been included in Appendix I. <br />5.2.1.2 GCL Quality Assurance Conformance Testing <br />Samples of the GCL were cut from random rolls for conformance testing by the third <br />party testing laboratory at the manufacturing plant in accordance with the CQA manual <br />and project specifications. Conformance testing included the following: <br />• bentonite mass per unit area (ASTM D-5993) <br />• bentonite moisture content (ASTM D-4643) <br />• index flux (ASTM D-5887) <br />Vector Engineering, Inc. - 143E Spring Hill Drive - Grass Valley, CA 95945 - (530) 272-2448 <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.