Laserfiche WebLink
Foothill Sanitary Landfill — Module 1 December 2003 <br />County of San Joaquin Job No. 031602.00.02 <br />Strength0 Table 4 — Shear Testing Summary <br />5.2.2 GCL Installation <br />5.2.2.1 Earthworks <br />® Surface Preparation <br />Prior to installation of the GCL, Vector's CQA Monitor inspected that the foundation <br />layer and sideslope subgrade had been placed as specified by the Technical <br />Specifications and that there were no changes in surface condition that required repair <br />work. Additionally, Vector's CQA Monitor obtained the subgrade surface acceptance <br />from the liner installer, D & E, as required by the project specifications. <br />5.2.2.2 GCL Deployment <br />CQA activities during GCL deployment include field panel identification, panel <br />placement, and panel protection as discussed in the following: <br />® Field Panel identification <br />Prior to GCL deployment, Vector's CQA Monitor and D & E (liner subcontractor) <br />discussed and agreed regarding the identification code for each panel deployed. During <br />the deployment, Vector's CQA Monitor verified that the subcontractor marked all the <br />panels deployed and that each panel placed was marked with the manufacturer roll <br />number. <br />1� <br />Vector Engineering, Inc. • 143E Spring Hill Drive • Grass Valley, CA 95945 • (530) 272-2448 <br />24 <br />"m - m.,e, I. <br />C.. - •. - <br />NEE <br />•� ' -z• •. ■ •� •�� ilk i <br />oc.n-m- 0FF� �� n <br />5.2.2 GCL Installation <br />5.2.2.1 Earthworks <br />® Surface Preparation <br />Prior to installation of the GCL, Vector's CQA Monitor inspected that the foundation <br />layer and sideslope subgrade had been placed as specified by the Technical <br />Specifications and that there were no changes in surface condition that required repair <br />work. Additionally, Vector's CQA Monitor obtained the subgrade surface acceptance <br />from the liner installer, D & E, as required by the project specifications. <br />5.2.2.2 GCL Deployment <br />CQA activities during GCL deployment include field panel identification, panel <br />placement, and panel protection as discussed in the following: <br />® Field Panel identification <br />Prior to GCL deployment, Vector's CQA Monitor and D & E (liner subcontractor) <br />discussed and agreed regarding the identification code for each panel deployed. During <br />the deployment, Vector's CQA Monitor verified that the subcontractor marked all the <br />panels deployed and that each panel placed was marked with the manufacturer roll <br />number. <br />1� <br />Vector Engineering, Inc. • 143E Spring Hill Drive • Grass Valley, CA 95945 • (530) 272-2448 <br />24 <br />