My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />Foothill Sanitary Landfill — Module 1 December 2003 <br />County of San Joaquin Job No. 031602.00.02 <br />• Field Panel Placement <br />During the panel placement, Vector's CQA onitor(s) kept panel deployment logs. <br />These logs recorded the location (panel number and roll number), installation schedule <br />(date and time), weather conditions (temperature and wind), and GCL type. These <br />panel deployment logs are presented within Appendix I. To protect the GCL, HDPE <br />liner was deployed concurrently with the GCL placement. Deployment was performed <br />in general conformance with the project specifications. <br />5.2.3 Defects and Repairs <br />Vector's CQA Monitor inspected all seams and non -seam areas of the GCL for defects, <br />holes, displaced panels, premature hydration, and any sign of contamination by foreign <br />material. <br />All defects were recorded as part of the daily construction report prepared by Vector's <br />CQA Monitor. Appropriate repairs were completed prior to installation of the overlying <br />HDPE material. <br />5.3 Geomembrane <br />5.3.1 Geomembrane Material <br />The 60 -mil high-density polyethylene (HDPE) geomembrane manufactured by GSE <br />was used in the liner system for Module 1. <br />5.3.1.1 Receiving Inspection <br />Upon arrival by truck shipment, the unloading and storage of the geomembrane rolls <br />were observed by Vector's CQA Monitors. Each roll of geomembrane was logged in by <br />roll number and the roll numbers then cross-checked against the quality control <br />documents provided by the supplier, GSE. Following this inspection and approval, the <br />material was released to the Contractor for installation. A copy of the log of <br />geomembrane received has been included in Appendix J. The manufacturer's QC data <br />have also been included within Appendix J. <br />Vector Engineering, Inc. - 143E Spring Hill Drive - Grass Valley, CA 95945 • (530) 272-2448 <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.