Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00.02 <br />Project Name: <br />Client Or Manager: <br />Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill <br />County of San Joaquin <br />1 79 <br />Modules- Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />6-18-03 <br />Wednesday <br />General Contractor. <br />Liner Contractor. <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Piechoto/ Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site soils <br />I Partly ClouL 800 <br />Frank Dell -Era / Jeremy Freas <br />Equipment Utilized: <br />631C Cat Scraper, 140H CatGrader, D9G Dozer, 825 Sheepsfoot Cat compactor, Water Truck. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 5 Man crew Surveyors Group Inc.: 2 man crew <br />Wood Bros.had a 631 scraper excavating out 6" to a 1' of foundation layer material to construct test pads. <br />Wood Bros utilized the compactor to break the material up then moisture conditioned the material and <br />compacted back in place utilizing the 631 scraper and 825 compactor. Wood Bros brought in a 1404 grader <br />to turn the excavated foundation layer materials for break down and moisture conditioning. <br />Surveyors Group Inc. set 3 control points outside of the construction area. <br />Tim Reed Electrician hooked power to CQA's trailer. <br />Brazil Water maintained moisture in test pad areas as Wood Bros continued construction of them. <br />Vector Engineering, Inc. CQA observed construction of test pads to verify foundation layer material meets <br />specifications. CQA performed density tests with no results until 2 proctor curves are performed on the test <br />pad material. CQA set-up proctors, sieves and PI samples. <br />Bryan Fritzler, Mike Carroll on site. <br />CQA discussed with Wood Bros that they are going to construct test pads to see if the material will meet the specifications after <br />they work it for a while. Wood Bros would like some compaction tests performed, CQA informed Wood Bros that test results <br />could not be given until proctors are performed on the materials tested. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />