Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 0312-3901 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number. Days left in contract <br />Module 1 Foothill Landfill <br />County of San Joaquin <br />2 78 <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />6-19-03 <br />Thursday <br />General Contractor. <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site tan Brown sandy silt <br />Clear Warm 820 <br />Frank Dell -Era / Jeremy Freas <br />Equipment Utilized: <br />2-631C Cat Scra er, 140H CatGrader, D9G Dozer, 825 Shee sfoot Cat com actor, Water Truck. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 5 Man crew Surveyors Group Inc.: 2 man crew <br />Wood Bros.had 2- 631 scraper excavating out 6" to a F of foundation layer material to construct test pads on <br />the north and west end of the floor of module 1. Wood Bros utilized the compactor and grader to break the <br />material up then moisture conditioned the material and compacted back in place utilizing the scraper to <br />wheel roll and the 825 to compactor. Brazil Water maintained moisture in test pad areas and access roads. <br />Surveyors Group Inc. performed a topo of the module <br />Vector Engineering, Inc. CQA attended the weekly construction meeting. CQA observed construction of test <br />pads to verify foundation layer material meets conformance specifications. CQA performed 2 proctor curves, <br />40 <br />2Pis and 2 washes on the test pad material. CQA pulled a #200 wash on the 3r test pad and 2 #200 washes <br />on the berm to the south of Module 1. <br />Bryan Fritzler, Mike Carroll on site. <br />Vector discussed with Wood bros. that what they are going to do is conpact test pads on the floor of Module 1 to see if the material can be broken <br />down to meet the specification. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />