NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 8 Man crew <br />Wood Bros. continued to excavate and process foundation layer material, to excavate unsuitable materials <br />from Module 1 and haul to the stockpile west of Module 1, to check depth of the excavation utilizing a laser. <br />Wood Bros. continued to process the foundation layer materials on the floor and on the northern slope in a <br />dry state to help break —up any over size materials. Wood Bros. continued to rip and process the material on <br />the north and eastern slopes utilizing the D6 in the afternoon. Wood Brothers moisture conditioned the <br />northern portion of the floor. Brazil Water maintained moisture on access roads. Wood Bros. placed visquine <br />and filled sandbags for placement in the pond to hold the visquine in place as the pond is filled over night. <br />Wood Bros. excavated a hole then placed visquine for containment of their fuel tank that arrived on site <br />today. <br />Vector Engineering, Inc. CQA observed excavation of unsuitable materials from the floor of Module 1. CQA <br />observed checking of excavated depth utilizing a laser set-up. CQA observed processing of proposed <br />foundation layer material, CQA performed a wash, proctor curve and 2-PI's. <br />Vector discussed with Wood bros. Compaction will probably not take place today if they can't maintain moisture in the foundation layer <br />material. Wood Brothers will line the water pond today so the site can fill it over night. Wood Bros. will continue to excavate 1' of foundation <br />layer material for processing. <br />Q % <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: JA1k <br />Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />9 71 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />6-30-03 <br />Monday <br />General Contractor. <br />Liner Contractor: <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site tan Brown sandy silt <br />Clear Warm 900 <br />Frank Dell -Era / Jeremy Freas <br />Equipment Utilized: <br />2-631C Cat Scraper, D9G Dozer, D6 Cat Dozer, 825 Sheepsfoot Cat compactor, Water <br />Truck. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 8 Man crew <br />Wood Bros. continued to excavate and process foundation layer material, to excavate unsuitable materials <br />from Module 1 and haul to the stockpile west of Module 1, to check depth of the excavation utilizing a laser. <br />Wood Bros. continued to process the foundation layer materials on the floor and on the northern slope in a <br />dry state to help break —up any over size materials. Wood Bros. continued to rip and process the material on <br />the north and eastern slopes utilizing the D6 in the afternoon. Wood Brothers moisture conditioned the <br />northern portion of the floor. Brazil Water maintained moisture on access roads. Wood Bros. placed visquine <br />and filled sandbags for placement in the pond to hold the visquine in place as the pond is filled over night. <br />Wood Bros. excavated a hole then placed visquine for containment of their fuel tank that arrived on site <br />today. <br />Vector Engineering, Inc. CQA observed excavation of unsuitable materials from the floor of Module 1. CQA <br />observed checking of excavated depth utilizing a laser set-up. CQA observed processing of proposed <br />foundation layer material, CQA performed a wash, proctor curve and 2-PI's. <br />Vector discussed with Wood bros. Compaction will probably not take place today if they can't maintain moisture in the foundation layer <br />material. Wood Brothers will line the water pond today so the site can fill it over night. Wood Bros. will continue to excavate 1' of foundation <br />layer material for processing. <br />Q % <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: JA1k <br />