My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. Daily Field Report Sequence Number. Days left in contra <br />Construction of 2 Landfill Modules- <br />County of San Joaquin 8 72 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />6-27-03 <br />Frida <br />General Contractor <br />Liner Contractor. <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Piechoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site tan Brown sandy silt <br />102° <br />Frank Dell -Era / Jeremy Freas <br />Equipment Utilized: <br />2-631C Cat Scraper, D9G Dozer, D6 Cat Dozer with Disc, 825 Sheepsfoot Cat compactor, Water Truck. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 7 Man crew <br />Wood Bros. continued to excavate and process foundation layer material. Wood Bros. continued to check <br />depth of the excavation utilizing a laser. Wood Brothers sealed the northern portion of the floor that had been <br />partially moisture conditioned by wheel rolling with the scrapers. Wood Bros compacted a portion of the <br />northern floor but due to lack of moisture it was not completed. Wood Brothers continued to excavate <br />unsuitable materials from Module 1 and haul to the stockpile west of Module 1. Wood Bros continued to rip <br />and process the slopes utilizing the D6 dozer. Brazil Water maintained moisture on access roads. <br />Vector Engineering, Inc. CQA observed excavation of unsuitable materials from the floor of Module 1. CQA <br />observed checking of excavated depth utilizing a laser set-up. CQA observed processing of proposed <br />foundation layer material, CQA performed 3 -washes a proctor curve and PI. CQA performed a couple <br />density checks for Wood Bros with the tests failing moisture content and compactive effort. <br />Vector discussed with Wood bros. Compaction will take place today if they can maintain moisture in the foundation layer material. Wood <br />Brothers will line the water pond the site is constructing on Monday. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed Bv: 1'Ic <br />
The URL can be used to link to this page
Your browser does not support the video tag.