NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 8 Man crew <br />Wood Bros. continued to place, moisture condition and compact foundation layer material on the <br />northeastern portion of Module 1. Wood Bros. hauled material from the processing pad to the 3'd bay off the <br />northern slope for the 1St lift utilizing the D9 dozer and 2-631 scrapers. Wood brothers continued to utilize 2 - <br />water trucks and the D6 with disc to moisture condition the foundation layer material prior to compaction. <br />Wood Bros. continued to check grade on each lifts thickness utilizing a laser set-up. Wood bros. excavated <br />some unsuitable materials from under the processing pad on the middle of Module 1. <br />Vector Engineering, Inc. CQA observed placement and tested compaction of foundation layer material <br />placed on the northwestern floor of Module 1. CQA performed several density tests with all tests meeting the <br />required specifications for this project. CQA performed a wash and moisture density relationship curve on <br />foundation layer material. 1 -sieve analysis on the pea gravel. CQA set-up plasticity index on the foundation <br />layer material. CQA set-up a sieve analysis and a moisture density relation ship curve on the stockpile <br />borrow on the south end of Module 1. <br />Vector discussed with Wood bros. moisture conditioning was to be performed with compaction on the foundation layer in the northwestern <br />corner of Module 1. <br />File Name: Foothill Landfill Prevared BY: Frank Dell -Era Reviewed <br />Vector Engineering <br />Davy Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager: <br />Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />15 65 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />7-9-03 <br />Wednesday <br />General Contractor <br />Liner Contractor: <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site tan Brown sandy silt <br />Clear Warm 1000 <br />Frank Dell -Era / Jeremy Freas <br />Equipment Utilized: <br />2-631C Cat Scraper, D9G Dozer, D6 Cat Dozer <br />with disc, 825 Sheepsfoot Cat compactor, 2 -Water Trucks. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 8 Man crew <br />Wood Bros. continued to place, moisture condition and compact foundation layer material on the <br />northeastern portion of Module 1. Wood Bros. hauled material from the processing pad to the 3'd bay off the <br />northern slope for the 1St lift utilizing the D9 dozer and 2-631 scrapers. Wood brothers continued to utilize 2 - <br />water trucks and the D6 with disc to moisture condition the foundation layer material prior to compaction. <br />Wood Bros. continued to check grade on each lifts thickness utilizing a laser set-up. Wood bros. excavated <br />some unsuitable materials from under the processing pad on the middle of Module 1. <br />Vector Engineering, Inc. CQA observed placement and tested compaction of foundation layer material <br />placed on the northwestern floor of Module 1. CQA performed several density tests with all tests meeting the <br />required specifications for this project. CQA performed a wash and moisture density relationship curve on <br />foundation layer material. 1 -sieve analysis on the pea gravel. CQA set-up plasticity index on the foundation <br />layer material. CQA set-up a sieve analysis and a moisture density relation ship curve on the stockpile <br />borrow on the south end of Module 1. <br />Vector discussed with Wood bros. moisture conditioning was to be performed with compaction on the foundation layer in the northwestern <br />corner of Module 1. <br />File Name: Foothill Landfill Prevared BY: Frank Dell -Era Reviewed <br />