Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number. Days left in contM <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />16 64 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />7-10-03 <br />Thursday <br />General Contractor. <br />Liner Contractor. <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site tan Brown sandy silt <br />Clear Warm 1050 <br />Frank Dell -Era / Jeremy Freas <br />Equipment Utilized: <br />2-631C Cat Scra er, D9G Dozer, D6 Cat Dozer with disc, 825 Sheepsfoot Cat compactor, 2 -Water Trucks. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 8 Man crew <br />Wood Bros. continued to place, moisture condition and compact foundation layer material on the northern <br />portion of Module 1. Wood Bros. hauled material from the processing pad to the 3rd bay off the northern <br />slope for the 1" lift and to the north middle for the 2nd lift utilizing the D9 dozer and 2-631 scrapers. Wood <br />brothers continued to utilize 2- water trucks and the D6 with disc to moisture condition the foundation layer <br />material prior to compaction. Wood Bros. continued to check grade on each lifts thickness utilizing a laser <br />set-up. Wood bros. utilized the 825 to compact with the 631 scrapers wheel rolling the surface. <br />Vector Engineering, Inc. CQA attended the weekly construction meeting. CQA observed placement and <br />tested compaction of foundation layer material placed on the northern floor of Module 1. CQA performed <br />several density tests with all tests meeting the required specifications for this project. CQA performed a <br />wash, sieve analysis, oven moisture content on every density test ran on foundation layer material. <br />Vector discussed with Wood bros. moisture conditioning was to be performed with compaction on the foundation layer in the northern portion of <br />Module 1. <br />11 <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed Bv: JAW I <br />