Laserfiche WebLink
Regular site inspections were performed during the first semester of 2002. A summary of the <br /> standard observations for the semester has been compiled(Appendix G). A signature on the <br /> form certifies that all observations were performed and are accurate. <br /> RUN-OFF/RUN-ON FACILITIES <br /> The Foothill Sanitary Landfill utilizes several methods to control run-on and run-off. The <br /> natural topography of the area controls any run-on into the site. Also,the working area is a <br /> 1 significant distance from the property boundary, so run-on from surrounding properties is <br /> minimal. To control run-off, a perimeter ditch along the north,west and east ends of the unit <br /> directs all storm water run-off into a sedimentation basin on the east side of the site. The rest of <br /> the run-off from the unit gathers into a temporary sedimentation basin that is the excavation of a <br /> future module. There were no breeches to any of the run-on/run-off facilities during this <br /> monitoring period. They will continue to be monitored in the future. <br /> ' OTHER ANALYSIS <br /> Groundwater samples were collected from landfill supply well LW-1 and analyzed for all <br /> monitoring and field parameters. Results are included. <br /> Foothill Sanitary Landfill 9 Department of Public Works/Solid Waste <br /> I"Semester 2003 Groundwater Monitoring Report County of San Joaquin-July 29,2003 <br />