Laserfiche WebLink
7.0 Schedule of Work <br /> The schedule of work proposed to prepare near-term Partial Cover and Drainage Plans for <br /> Module"I", and for Module 1, include the following work activities. <br /> Work Activity Date <br /> t1. Submit workplan, summarize Design Criteria to be November 1,2003 <br /> used for development of the Module"Partial Cover <br /> Grading and Drainage Plan" <br /> 2. Obtain CVRWQCB comments. December 15,2003 <br /> 3. Obtain and evaluate existing conditions for Partial March 1,2004 <br /> Cover and Drainage Plan for Module"I" <br /> 4. Prepare "Partial Cover and Drainage Plan" and related May 1,2004 <br /> documents for Module"I"and future Modules. (not including competitive <br /> bid documents) <br /> 5. Construct improvements for Module"P', and,as To be determined, <br /> needed, for Module 1 depending on the work <br /> needed. <br /> October 28,2003 6 Foothill Sanitary Landfill <br /> Partial Cover Workplan Public Works/Solid Waste <br />