Laserfiche WebLink
If the quantity of the work requires that the County seek formal bids,the drawings that may be <br /> needed include: <br /> 1. Title page with vicinity map <br /> ' 2. Grading and Drainage Plans and Details for Module"I" <br /> 3. Grading and Drainage Details <br /> ' Future modules will be addressed by the preparation of typical details, including: <br /> 1. Typical Details for Partial Covers (Module 1 and Future Modules) <br /> 2. Typical Details for Drainage Facilities (Module 1 and Future Modules) <br /> 3. Maintenance Provisions(See below) <br /> 6.0 Maintenance Provisions <br /> The need for maintenance will be based on inspections required and performed in accordance <br /> with Order No. R5-2003-0020,Monitoring and Reporting Program,D. Monitoring, Item 5, <br /> Facility Monitoring a)Facility Inspection,annually, and b) Storm Events. Maintenance of soil <br /> cover and installed drainage and erosion control measures will include: <br /> 1. Temporar Repairs—will be made utilizing thin film plastic sheeting, compacted soil, <br /> sand bags,cobbles,or other materials as needed to control run-off and minimize <br /> additional erosion damage when damage occurs. Manufactured erosion control materials <br /> ' may be applied as needed to prevent further damage during subsequent storm events. <br /> 2. Permanent Repairs—will be evaluated and designed based on damage and interim repairs <br /> noted during previous storm events, and on field evaluations in early summer. It is our <br /> intent that construction details will be developed and construction completed prior to <br /> October 3l t of each year. <br /> October 28,2003 5 Foothill Sanitary Landfill <br /> Pattial Cover Workplan Public Works/Solid Waste <br />