My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003_5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:41:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003_5
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003_5.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If the quantity of the work requires that the County seek formal bids,the drawings that may be <br /> needed include: <br /> 1. Title page with vicinity map <br /> ' 2. Grading and Drainage Plans and Details for Module"I" <br /> 3. Grading and Drainage Details <br /> ' Future modules will be addressed by the preparation of typical details, including: <br /> 1. Typical Details for Partial Covers (Module 1 and Future Modules) <br /> 2. Typical Details for Drainage Facilities (Module 1 and Future Modules) <br /> 3. Maintenance Provisions(See below) <br /> 6.0 Maintenance Provisions <br /> The need for maintenance will be based on inspections required and performed in accordance <br /> with Order No. R5-2003-0020,Monitoring and Reporting Program,D. Monitoring, Item 5, <br /> Facility Monitoring a)Facility Inspection,annually, and b) Storm Events. Maintenance of soil <br /> cover and installed drainage and erosion control measures will include: <br /> 1. Temporar Repairs—will be made utilizing thin film plastic sheeting, compacted soil, <br /> sand bags,cobbles,or other materials as needed to control run-off and minimize <br /> additional erosion damage when damage occurs. Manufactured erosion control materials <br /> ' may be applied as needed to prevent further damage during subsequent storm events. <br /> 2. Permanent Repairs—will be evaluated and designed based on damage and interim repairs <br /> noted during previous storm events, and on field evaluations in early summer. It is our <br /> intent that construction details will be developed and construction completed prior to <br /> October 3l t of each year. <br /> October 28,2003 5 Foothill Sanitary Landfill <br /> Pattial Cover Workplan Public Works/Solid Waste <br />
The URL can be used to link to this page
Your browser does not support the video tag.