Laserfiche WebLink
SECTION 6 <br /> Summary <br /> This report presents the construction documents and supporting design criteria required for <br /> completion of WMU FU-04 at the Forward Landfill. Design calculations have been performed and <br /> construction documents prepared to demonstrate that the design of this unit complies with Forward's <br /> WDRs, and Title 27 requirements. <br /> These Design and Construction Documents have been prepared under the supervision of Bryan A. <br /> Stirrat whose seal as a Registered Professional Engineer in the State of California is affixed below. <br /> Q?,0FESS/0N9l� <br /> SYAN A. <br /> STIR T ' <br /> m <br /> ir 22531 <br /> Exp. 12-31-05 <br /> CIVIL <br /> s,�AF� CMOF P <br /> Brya % Stirrat, P.E. <br /> RCE No. 22631 —Expiration 12/31/05 <br /> FU-04 REPORT.DOC 6-1 <br />