Laserfiche WebLink
SECTION 7 <br /> References <br /> Brian A. Stirrat Associates (BAS),Final Draft Joint Technical Document,Forward Landfill, August <br /> 2001. <br /> Bray,J.D., et al.,"Simplified Seismic Design Procedure for Geosynthetic-Lined, Solid Waste <br /> Landfills," Geosynthetics International,Vol. 5,Nos 1-2, 1998. <br /> CH2M HILL, Comprehensive Landfall Description, Forward Landfill Inc., January 1992. <br /> CH2M HILL,Design and Construction Documents, WMUD-93, Forward Inc. Landfill, April 1993, <br /> (I 993a). <br /> CH2M HILL,Report of Waste Discharge, 1993 Permit Revisions, Forward, Inc. Landfill, San <br /> Joaquin County, California,June 1993, (1993b). <br /> CH2M HILL,Preliminary Closure and Post-Closure Maintenance Plan, Forward,Inc.Landfill, San <br /> Joaquin County, California, September 1993, (1993c). <br /> CH2M HILL, Construction Quality Assurance Report, WMU D-93, Forward, Inc. Landfill,January <br /> 1994, (1994a). <br /> CH2M HILL,Buena Vista Landfall, Module 3. Design, Construction, and Operations Documents. <br /> Prepared for County of Santa Cruz,March 1994, (1994b). <br /> CH2M HILL,Design and Construction Documents, WMUD-94,Forward Inc.Landfill,June 1994, <br /> (1994c). . . <br /> CH2M HILL,Buena Vista Landfall, Module 3. Construction Quality Assurance Report. Prepared for <br /> County of Santa Cruz,November 1994, (1994d). <br /> CH2M HILL, Construction Quality Assurance Report, WMU D-94, Forward,Inc. Landfill,December <br /> 1994, (1994d). <br /> CH2M HILL,Preliminary Closure and Post-Closure Maintenance Plan, Forward,Inc. Landfill, San <br /> Joaquin County, California,Revised December 1994, (1994e). <br /> CH2M HILL,Design and Construction Documents, WMUD-95, Forward Inc.Landfill,January <br /> 1995, (1995a). <br /> CH2M HILL, Construction Quality Assurance Report, WMUD-95, Forward Inc. Landfill, October <br /> 1995, (1995b). <br /> CH2M HILL, Clay Versus GCL Base Liner Memorandum, Figure 213, February 24, 1997, (1997a). <br /> CH2M HILL,Design and Construction Documents, WMUD-97,Forward Inc. Landfill,April 1997, <br /> (I 997b). <br /> CH2M HILL, Construction Quality Assurance Report, WMUD-97, Forward Inc. Landfill, October <br /> 1997, (1997c). <br /> FU-04 REPORT.DOC 7-1 <br />