Laserfiche WebLink
BURY EDGE OF <br /> OVERLAP EXISTING APPROX. GEOMEMBRANE 60 mil HDPE 3-INCH DIA <br /> AND NEW GEOTEXTILE REMOVE EXISTING 3' REMOVE EXISTING GEOMEMBRANE PERFORATED HDPE PIPE <br /> A MINIMUM OF 3-FEET 60 MIL HDPE GENERAL EARTHFILL BERM (NOTE 5) PROTECTIVE <br /> GEOMEMBRANE 10.5' EXISTING SOIL BERM COARSE OPE TION LAYER <br /> PROTECTIVE J PROTECTIVE <br /> OPERATION LAYER 1 1 APPROX OPERATION LAYER <br /> MIN GRAVEL <br /> ::. <br /> APPRO - ur <br /> 4' <br /> 1 ••••••••••••••••'••"""""""""""" EXISTING VEGETATIVE LAYER 3• <br /> 1' <br /> 1 EXISTING / <br /> GRANULAR DRAINAGE - VEGETATIVE EXISTING FOUNDATION LAYER'_ - M N ,,3 MATERIAL DRAINAGE <br /> LAYER <br /> MATERIAL EXISTING FOUNDATION LAYER i EXISTING CLAY LINER `\ FILTER GEOTEXTILE <br /> FILTER GEOTEXTILE" V EXISTING �'Y '\ 0) <br /> REMOVE EXISTING 3'/Ml 2'MIN FILTER CLAY LINER <br /> GRANULAR DRAINAGE GEOTEXTILE <br /> MATERIAL AND REPLACE w <br /> WITH GENERAL EARTHFILL WESTERN CONNECTION GRANULAR SOUTHERN TERMINATION/� <br /> DRAINAGE MATERIAL <br /> NTS SHT 3 NTS SHT 3 a <br /> Q <br /> a� <br /> 60 mil HDPE o <br /> APPROX. TOP DECK CLAY PLUG BERM GEOMEMBRANE PROTECTIVE <br /> 3' TERMINATION BERM HDPE PIPE (SEE NOTE 2) <br /> (GENERAL EARTHFILL) ELBOW JOINT CLAY PLUG 2, OPERATION LAYER <br /> PROTECTIVE 60 MIL SINGLE TEXTURED 0'S 3-INCH DIA (SEE NOTE 2) MIN 3' <br /> OPERATION LAYER HDPE GEOMEMBRANE 1 : 1 NON PERFORATED rn <br /> 1� P —I1 APPROX HDPE PIPE c•: o <br /> APPROX. - 4' EXISTING VEGETATIVE LAYER ROUTE TO m •• `�� _ _N <br /> 1' 3' WMU FU-04 BASE <br /> 0.51 <br /> 43V4 <br /> __ �SUBGRADE� - ::: io 0= <br /> i• FILL 3-INCH DIA HDPE <br /> / ' \ SEE NOTEGEOMEMBRANE BOOT.. /...SOLID H bIA DRAINAGER n <br /> GRANULAR DRAINAGE " -� MATERIAL <br /> EXISTING FOUNDATION LAYER EXISTING CLAY LINER `.� / TEE SECTION u <br /> MATERIAL ' EXISTING - - EXISTING FOUNDATION LAYER- END CAP FILTER FILTER GEOTEXTILE o <br /> FILTER GEOTEXTILE VEGETATIVE LAYER <br /> EXISTING CLAY LINER, <br /> N <br /> EASTERN TERMINATION f_P"\ SECTION <br /> NTS SHT3 NTS SHT4 O n � <br /> N � <br /> Lj Z u) I <br /> (p cli <br /> APPROX 60 mil HDPE ?N OD <br /> 3' GEOMEMBRANE :.:::::::.::::::::::::::::.:::::::.:......::::::::::::::. o U w <br /> TOP DECK - .PROTECTIVE OPERATIONS LAVE...... �'C�•i•:iCi•:�C:i•' FILTER GEOTEXTILE Q rn <br /> TERMINATION BERM r ::::..::.......:::::.:::•:::•:••:�.::�:::•::•:.::::.::.�:.�:: ¢ o <br /> GENERAL EARTHFILL v N <br /> 25' APPROX 0'S ( ) PROTECTIVE oJ0°•°OyyyGR4NULAR•DRAINAGE�MATERIAI --�°O° 0 w <br /> 4' 1 OPERATION LAYER O---- `----------------- - - �pZ <br /> 1X 1 EXISTING VEGETATIVE LAYER ' pl a <br /> ACCESS ROAD 1�, r-t'-A'PRO (SEE NOTE 1) rn s <br /> EXISTING CLAY LINER -- n <br /> EXISTING VEGETATIVE LAYER / i 2'MIN 3 - I <br /> GRANULAR DRAINAGE / 1 <br /> - MATERIAL EXISTING FOUNDATION LAYER w <br /> a $ o <br /> EXISTING,CLAY LINER EXISTING FOUNDATION LAYER FILTER GEOTEXTILE - w <br /> a4�� <br /> 3-INCH DIA saw <br /> NORTHERN TERMINATION AND ACCESS ROAD HOPEPPEED TYPICAL LINER AND LCRS SECTION <br /> NTS SHT 3 (NOTE 5) <br /> NTS SHT4 3>4 <br /> v <br /> 3-INCH DIA FILTER GEOTEXTILE APPROX 20 60-mil HDPE NOTES: <br /> PROTECTIVE PERFORATED (NOTE 4) GEOMEMBRANE 1.CONTRACTOR SHALL STRIP EXISTING VEGETATION. O U <br /> OPERATIONS LAYER HDPE PIPEIr GRANULAR DRAINAGE <br /> (NOTE 5) COARSE GRAVEL MATERIAL 2.EXTEND CLAY PLUG AND CLAY PLUG BERM APPROXIMATELY 10-FT IN <br /> LENGTH ON EITHER SIDE OF TEE INTERSECTION TO TIE IN TO EXISTING BERM. <br /> FILTER <br /> GEOTEXTILEY <br /> CLA 3.CLAMP HDPE GEOMEMBRANE ROOT TO 34NCH DIA HDPE PIPE USING <br /> PLUG BERMS TAINLESS STEEL CLAMP AND NEOPRENE GASKET. - <br /> cp <br /> d o a o00 �oea ap 9 000 p0 ,gp.- ..-..� 0 00, a 80 0000 Oo 0 0 4.OVERLAP GEOTEXTILES 2-FT AT TOP OF WRAPPED GRAVEL. Z (n <br /> --- --- - -----9- --- RIDGE OF EXISTING 3-INCH DIA J J J <br /> "v SOUTHERN TERMINATION II NONPERFORATED U- Q <br /> EXISTING 1 5.PERFORATED 3-INCH HDPE PIPE WITH 1/4-INCH DIA HOLES AT FOURTH w �- <br /> VEGETATIVE LAYER- `• �'-"'- APPROX 3° / BERM e 1 HDPE PIPE POINTS EVERY FINCHES. ZZ ~ �p <br /> Q o <br /> � - EXISTING CLAY LINER SOUTH SLOPE OF EXISTING \�� ROUTE TO o <br /> AUSTIN ROAD LANDFILL WMU FU-04 BASE of 0 <br /> N <br /> d. ZO <br /> EXISTING FOUNDATION LAYER oI <br /> \ i H <br /> <J <br /> N <br /> LCRS PIPE SECTION LCRS PIPE SECTION <br /> NTS SHT 3 NTS SHT 4 Essigy <br /> No.22631 <br /> EaD 12-31-05 a <br /> >7 Sheet 9 of 10 <br /> sr" �CAL1" P Rev <br />