Laserfiche WebLink
WMU FU-03/FU-04 <br /> PERIMETER BERM PROTECTIVE RIJ. <br /> (GENERAL EARTHFILLGEO LE <br /> I 6- <br /> MATERIAL) AND PLYWOOD <br /> "IN <br /> APPROX 10' <br /> 1 PERIMETER <br /> z <br /> 3' BERM <br /> ANCHOR TRENCH <br /> r 2 <br /> 3 <br /> 2'MIN <br /> GEOCOMPOSITE <br /> DRAINAGE NET <br /> TMIN <br /> 21—/6 PLYWOOD <br /> EXISTING 1 5 1 (SEE NOTE 6) <br /> GRADE <br /> VARIES 60 mil SINGLE SIDE GEOSYNTHETIC <br /> (VARIES) <br /> 01—- TEXTURED HDPE CLAY LINER <br /> GEOMEMBRANE 60-MIL SINGLE ANCHOR <br /> -————— ———— (NOTE 5) TEXTURED HOPE TRENCH <br /> 1 <br /> WMU SUBGRADE FILL " r GEOMEMBRANE 3'MIN <br /> , <br /> ART-03 7�0 <br /> 3SUBGRADE FILL <br /> GEOSYNTHETIC APPROXIMATE <br /> CLAY LINER EXISTING AUSTIN <br /> SECTION ROAD COVER AND <br /> REFUSE <br /> WMU FU-04 TOP OF SLOPE LINER TERMINATION SHT 3 <br /> NTS SECTION <br /> 0 <br /> WMU FU 03/FU-04 <br /> INTERFACE LINER TERMINATION AT TOP DECK SHT3 <br /> NTS <br /> PERIMETER BERM <br /> (GENERAL EARTHFILL <br /> MATERIAL) <br /> GEOCOMPOSITE PROTECTIVE <br /> fl- <br /> MIN MIN ¢ DRAINAGE NET OPERATIONS LAYER <br /> D Lu 60 rrTDoUBLE PLYWOOD q) <br /> D, <br /> ANCHOR TRENCH 1% • z(9 TEXTUREHDPE (SEE NOTE 6) C, <br /> < GEOMEMBRANE <br /> PERIMETER <br /> 2'MIN 0BERM <br /> .. <br /> ......... ............... .. <br /> 2 <br /> TMII <br /> GEOCOMPOSITE _ 00 <br /> EXISTING DRAINAGE NET -------- --------- 0 Ln 0) <br /> SUBGRADE FILL LIMIT <br /> GRADE GEOSYNTHETIC I GEOGRID z U-) I <br /> MIN 2 (VARIES) 60 mil SINGLE CLAY LINER CN <br /> TEXTURED HDPE z <br /> Lf) 00 <br /> GEOGRID VSUBGRADE FILL D- 0) <br /> LL 0 < <br /> (NOTES) x <br /> ---- ------- GEOMEMBRANE Z <br /> SUBGRADE FILL ANCHOR < <br /> ------�:AIJSTIN ROAD cc \-SUBGRADE FILL = <br /> GEOSYNTHETIC u?< TRENCH t-u cli <br /> GRADE <br /> LANDFILL EXISTINGIN MIN wCLAY LINER A TMIN :D wt,- <br /> 60 mil DOUBLE V)oz <br /> GENERAL EARTHFILL- TEXTURED HDPE < <br /> GEOMEMBRANE cn 0 <br /> SECTION 0) r <br /> 0) Q- <br /> WESTERN TERMINATION OF INTERFACE SHT 3 CUSHION FILTER SECTION 0) <br /> GEOCOMPOSITEGEOTEXTILE. GEOTEXTILE NTS SHT3 <br /> 60 mil DOUBLE <br /> DRAINAGE NET TEXTURED HOPE <br /> GEOMEMBRANE 0.5-MIN GRANULAR GEOCOMPOSITE 't <br /> EXISTING DRAINAGE MATERIAL <br /> DRAINAGE NET .1 <br /> GEOCOMPOSITE <br /> REMOVE EXISTING 0 <br /> REMOVE EXISTING a <br /> DRAINAGE NET GEOGRID REMOVE EXISTING 60 mil SINGLE <br /> PROTECTIVE OPERATIONS PERIMETER BERM SOIL BERM TEXTURED HDPE EL <br /> LAYER(SEE NOTE 2) (NOTE 60 mil DOUBLE PROTECTIVE <br /> PROTECTIVE 0.5'MIN GEOCOMPOSITE <br /> -�--EXISTING 60 mil SINGLE I R GEOMEMBRANE <br /> OPERATIONS LAYER AND REPLACE WITH GENERAL TEXTURED HOPE DRAINAGE NET OPERATIONS LAYER M -1 d <br /> TEXTURED HOPE E z REMOVE 60 mil HDPE <br /> GRANULAR DRAII GEOSYNTHETIC EARTHFILL GEOMEMBRANE SUBGRADE Ha 01 0- <br /> GEOMEMBRANE MATERIAL CLAY LINER GEOMEMBRANE FILL a <br /> CLAY LINER 96% < <br /> GEOSYNTHETIC VARIES REFUSE GEOSYNTHETIC <br /> ....................0.0 ......... ........ ....... . <br /> CLAY LINER ........................ .................................... <br /> z <br /> 20 . .. . . ...................................... .... ......................... w.:................... <br /> c <br /> ----------------- <br /> - - - - - - - - - - <br /> 7 7 7-11 <br /> � 0.5'MIN 1 0 u <br /> ID GRANULAR BACKFILL WITH <br /> 4-'Z' <br /> FILTER DRAINAGE GENERAL EARTHFILL FILTER GEOTEXTILE <br /> 0- t <br /> (L Z' GEOGRID MATERIAL SEE NOTE 3 <br /> GEOTEXTILE <br /> M114 <br /> GEOGRID <br /> < REMOVE <br /> GEOCOMPOSITE COARSE GRAVEL GEOGRID <br /> NOTE 4 DRAINAGE NET CLAY PLUG REMOVE EXISTING <br /> PLYWOOD(NOTE 1) REMOVE 3-INCH DIA <br /> b-M,�N <br /> "- PERFORATED HDPE PIPE wGEOSYNTHETIC <br /> SUBGRADE FILL z U) <br /> = <br /> 60 mil DOUBLEj <br /> CLAY LINER SECTION / <br /> TEXTURED H u- <br /> GEOMEMBRA E EXISTING TOP DECK CONNECTION SHT3 r U-1 <br /> GEOCOMPOSITE NOTES: NTS < 0 <br /> DRAINAGE NET 1.REMOVE EXISTING TERMINATION BERM AND PLYWOOD AND PLACE ENDS OF EXISTING <br /> EXISTING 60 mil SINGLE <br /> GEOSYNTHICS IN ANCHOR TRENCH. 0 2 < <br /> TEXTURED HDPE EXISTING 6.OWNER SHALL PLACE A PROTECTIVE PLASTIC COVERING OVER THE GEOCOMPOSITE Of 0 <br /> GEOMEMBRANE GEOSYNTHETIC 2REMOVE EXISTING PROTECTIVE OPERATIONS LAYER FOLLOWING DRAINAGE NET.THE PROTECTIVE PLASTIC COVERING SHALL BE REMOVED BY OWNER) < U) <br /> . <br /> CLAY LINER INSTALLATION OF NxT ANCHOR TRENCH.REMOVE EXISTING PROTECTIVE BEFORE THE SIDE SLOPE OPERATIONS LAYER IS PLACED AGAINST THE GEOCOMPOSITE 0 0 <br /> 0 <br /> OPERATIONS LAYER IN MANNER THAT DOES NOT DAMAGE UNDERLYING DRAINAGE NET.THE SIDE SLOPE PROTECTIVE OPERATIONS LAYER SHALL BE PLACED - <br /> GEOSYNTHETICS. IN CONJUNCTION WITH WASTE PLACEMENT(BY OWNER).TO A MAXIMUM HEIGHT OF <br /> uj <br /> 3.OVERLAP EXISTING AND NEW GEOSYNTHETICS A MINIMUM 3-FEET. 19 ABOVE THE LEVEL OF REFUSE.THE OWNER SHALL PLACE THE SIDE SLOPE OPERATIONS <br /> LAYER USING A WHEELED LOADER,WITH NO EQUIPMENT LOADING ON THE SLOPE.OWNER <br /> 4.SEW DOWNSLOPE EDGE OF GEOSYNTHETIC CLAY LINER CLOSED TO <br /> SHALL PROVIDE TEMPORARY ANCHORING OF PROTECTIVE PLASTIC COVERING.TEMPORARY 3.MAINTAIN BENTONITE WITHIN GEOSYNTHETIC CLAY LINER. ANCHORAGE SHALL NOT DAMAGE UNDERLYING LINER. o ES <br /> sl <br /> 5.PLACE TEXTURED SIDE OF GEOMEMBRANE AGAINST CLAY LINER OR GCL. 7.USE PLYWOOD ON EASTERN TERMINATION.PLYWOOD IS NOT NEEDED ON WESTERN TERMINATION. r" <br /> No.22631 <br /> 8.OWNER SHALL PLACE PROTECTIVE OPERATIONS LAYER ON NORTHERN SLOPE ONLY TO APPROX EL. p. 12-31-05 <br /> 65'ONCE THE FUTURE CONNECTION AS SHOWN ON SECTION Y IS CONSTRUCTED THE DINNER CAN CONTINUE SheetJgof 10 <br /> TO PLACE PROTECTIVE OPERATIONS LAYER ON THE SLOPE. cr <br />