Laserfiche WebLink
Above the water bearing zone,the soil layers are moderately to well-cemented layers of sandstone <br /> and siltstone with claystone and conglomerates. This soil is mostly moderately slow in <br /> permeability with sporadic sandy layers that are well drained. <br /> Construction <br /> Module-r,,is an unlined module covering approximately 80 acres cover. <br /> Module 1 includes approximately 34 acres of composite liner. This module was completed in <br /> December 2003. The liner system of Module 1 and future modules consists of(from top to <br /> bottom): <br /> 2-foot-thick soil operations layer <br /> 8 oz/synthetic nonwoven geotextile separator/filter <br /> • Drainage layer: <br /> - Base: 0.75-foot-thick gravel drainage layer with leachate collection troughs with <br /> 4-inch-diameter piping <br /> - Side slopes: geocomposite drain layer with nonwoven geotextile separator/filter <br /> • 60-mil HDPE geomembrane <br /> • Geosynthetic clay liner(GCL) on prepared surface <br /> • 1-foot thick prepared subgrade(base only). <br /> COMPLIANCE HISTORY SUMMARY <br /> Prior to March 2000,the landfill was found not to impact to groundwater. From March 2000 to <br /> October 2001,volatile organic compounds(VOCs)were consistently and repeatedly detected at <br /> groundwater monitoring well MW-3. These detections have been ascribed to ponding along a <br /> road on refuse immediately adjacent to that monitoring well during the winters of 1995/1996, <br /> 1996/1997, and 1997/1998. Impact to groundwater at other wells was not indicated. <br /> In the spring of 1998,ponding was corrected by covering with refuse and grading. However, <br /> penetration of water into the refuse below the ponding area apparently caused an increase in <br /> landfill gas(LFG)production in the years after ponding was corrected, sufficient to impact the <br /> groundwater. Correction of the ponding has since allowed the LFG production to dissipate, and <br /> groundwater contamination has not been confirmed in MW-3 since October 2001. Contamination <br /> has not been confirmed at other groundwater monitoring wells at any time. <br /> On November 6, 2002, the County submitted an Evaluation Monitoring Plan which proposed <br /> methods to delineate the nature and extent of groundwater impact seen at MW-3. The Plan <br /> included drilling and sampling from temporary borings, and a step-out step-down approach if <br /> groundwater contamination was detected at those borings. <br /> Foothill Sanitary Landfill 2 Department of Public Works/Solid Waste <br /> 1ST Semester 2004 Groundwater Monitoring County of San Joaquin-July 27,2004 <br />