My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2004_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2004_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 2:52:26 AM
Creation date
7/3/2020 10:42:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2004_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2004_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION <br /> General <br /> San Joaquin County is submitting this first semester 2004 monitoring report for the Foothill <br /> Sanitary Landfill (FSL) in compliance with Waste Discharge Requirements (WDR) Order <br /> No. R5-2003-0020. <br /> The FSL is located in eastern San Joaquin Count on Waverly Road, four miles east of Linden, <br /> q Y Y <br /> CA(Figure 1). Land uses within 1,000 feet of the facility are agricultural. The vicinity receives <br /> an average of about 18 inches of precipitation per year. <br /> The Foothill Sanitary Landfill is a single Class III Waste Management Unit on an 800-acre parcel. <br /> This Unit is comprised of Module "I",newly constructed Module 1, and future modules. Future <br /> modules will overlap onto the completed modules until final closure of the Unit. The size of <br /> future modules will be selected in accordance with the refuse disposal rate. <br /> The total capacity of the landfill is approximately 102 million cubic yards. The active life of the <br /> facility is estimated to allow disposal until year 2050,based on current disposal rates and <br /> capacities (Table 1). The estimated service life will change if disposal rates differ significantly <br /> than those predicted. <br /> TABLE 1 <br /> FIRST SEMESTER 2004 MONTHLY REFUSE DISPOSAL <br /> FOOTHILL SANITARY LANDFILL <br /> MONTH REFUSE DISPOSAL <br /> (TONS). <br /> January 23,297 <br /> February 19,087 <br /> March 25,854 <br /> April 24,761 <br /> May 23,382 <br /> June 24,383 <br /> Geology <br /> The first water bearing zone encountered is in sandy gravel at a depth of more than 200 feet. <br /> Groundwater elevations range from approximately 46 to 61 feet MSL. The groundwater is <br /> unconfined or partially confined. Groundwater elevations fluctuate less than one foot seasonally. <br /> Foothill Sanitary Landfill ' Department of Public Works/Solid Waste <br /> 1 sr Semester 2004 Groundwater Monitoring County of San Joaquin-July 27,2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.