My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005_2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2005_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:42:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005_2
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2005_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ct <br /> Transfer trucks and roll-off boxes shag be cleaned periodically in the wash station. <br /> Odor complaints shag be referred to the San Joaquin_Vatley Unified Air Pollution <br /> Control District for processing under Rule 4107. <br /> D. SEISMICITY <br /> (1) POTENTIALLY SIGNIFICANT IMPACT. SEISMIC GROUND SHAKING <br /> There is a strong likelihood that the site will experience seismic ground shaking <br /> during the life of the sfrtitftue. The ground shaking will impose laterial shearing <br /> forces on the planned Wires. The structures will be more susceptible to the <br /> effects of ground shaking during construction. <br /> Findings: <br /> Changes or alterations have been required in, or incorporated into, the project <br /> which avoid or substantially lessen the significant environmental effect as <br /> identified in the Final EIR. <br /> Statements of Fad: <br /> The impact wilt be reduced by the following: <br /> Design the structure in conformance with all applicable building codes to support <br /> the anticipated earthquake loads. ff strong ground shaking occurs during <br /> construction, repairs may need to be performed at that time. <br /> E. AIR QUAD Y <br /> (1) POTENTIALLY SIGNIFICANT IMPACT: CONSTRUCTION RELATED <br /> PARTICULATES <br /> The effects of construction activities would be increased dustfall and locally <br /> elevated levels of PM-10 (particulate matter, 10 microns) downwind of <br /> construction activity. Construction dust has the potential for creating a nuisance <br /> at nearby properties. <br /> Finding: <br /> Changes or alterations have been required in, or incorporated into, the project <br /> which avoid or substantially lessers the significant environmental effect as <br /> identified in the Final BFL The mitigation measure is fisted below. <br /> Statement of Fact: <br /> The impact will be reduced by the following: <br /> Suspend earth-moving and grading activities during periods of high winds when <br /> dust control measures are tunable to avoid visible dust plumes. <br /> Attachment A -6- UP-93-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.