Laserfiche WebLink
During the dry season (May-October), provide equipment and staffing for <br /> watering all exposed or disturbed soil surfaces at least twice daily, including <br /> weekends and holidays. An appropriate dust palliative-or suppressant,added to <br /> water before applicatron, should be utilized, <br /> Require periodic clean-up of mud and dirt carried onto paved roads from the site. <br /> (2) POTENTIALLY SIGNIFICANT IMPACT: ODORS <br /> As part of the facility operation,a number of potential odor sources are present. <br /> The solid waste itself is an obvious potential odor source. The unloading areas, <br /> equipment that comes in contact with waste, collection vehicles, and landfill <br /> transfer trailers are also potential odor sources. <br /> Findings: <br /> Changes or alterations have been required in, or incorporated into, the project <br /> which avoid or substantially lessen the significant environmental effect as <br /> identified in the Final EIR <br /> Statement of Fact: <br /> The impact will be reduced by the following: <br /> The proposed transfer operation shall be enclosed in a building to reduce <br /> exposure of waste to the atmosphere. <br /> _/® The tipping floor shall be regularly swept with a mechanical sweeper. <br /> Transfer trucks and roll-off boxes shall be cleaned periodically in the wash station. <br /> Odor complaints shall be referred to the San Joaquin Valley Unified Air Pollution <br /> Control District for processing under Rule 4107. <br /> F. NOISE <br /> (1) POTENTIALLY SIGNIFICANT IMPACT CONSTRUCTION PHASE NOISE <br /> There would-be a significant shit-term noise impact upon the residents located <br /> directly north and south of the proposed facility. <br /> Findi <br /> Changes or alterations have been required in, or incorporated into, the project <br /> which avoid or substantially lessen the significant environmental effect as <br /> identified in the Final EIR. The mitigation measure is listed below. <br /> Statement of Fact: <br /> The impact will be rem by the following: <br /> f <br /> tachment A -7- UP-93-2 <br />