SECTION 5 <br /> (03/08) <br /> 5-1.07 CONTRACT CHANGE ORDERS.--Certain Contract Change <br /> Orders may be approved by the Director of Public Works, all others shall be approved <br /> by the Board of Supervisors. <br /> 5-1.08 ACCEPTANCE OF CONTRACT.--Acceptance of contract as <br /> complete shall require the approval of the Board of Supervisors. <br /> 5-1.09 EXTRA WORK.--Section 4-1.03D, "Extra Work," of the Standard <br /> Specifications is amended by adding the following between the second and third <br /> paragraphs:, <br /> If, in the opinion of the Engineer, such work cannot reasonably be <br /> performed concurrently with other items of work, and if a controlling item <br /> of work is delayed thereby, an adjustment of contract time will be made. <br /> 5-1.10 AIR POLLUTION CONTROL.--Air pollution control shall conform to <br /> the provisions in Section 7-1.01 F, "Air Pollution Control," of the Standard Specifications <br /> and these special provisions. <br /> Material to be disposed of shall not be burned unless the Contractor has <br /> obtained a permit to burn combustible material resulting from clearing and grubbing <br /> operations from an air pollution control officer of the local or regional authority. A copy <br /> of the permit shall be filed with the Engineer before beginning any burning. All such <br /> burning shall be conducted in strict conformance with the provisions stipulated in said <br /> permit and at such times and in such manner as to prevent the fire from spreading to <br /> areas adjoining the right of way. <br /> In case the burning precedes construction operations, the piles may be placed in <br /> the center of the right of way; otherwise the piles shall be placed in the most convenient <br /> location at the side of the right of way and beyond slope lines where they may be <br /> burned without damage to the surrounding forest cover or adjacent property. <br /> f5-2 <br /> (SPEMCO-MCO-5-2) <br />