My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2006_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 10 <br /> SPECIAL <br /> r-• <br /> i' I. COORDINATION WITH ENGINEER AND INSPECTORS <br /> 1. Documenting that the project is constructed in accordance with the contract is <br /> ' of the essence in this contract. Work performed without inspection when <br /> inspection is required will be rejected and the Contractor shall repeat the work <br /> with proper inspection. <br /> 2. The Contractor shall remove work found not to be acceptable at his cost and <br /> with no additional time allowed for this work. <br /> J. ACCESS <br /> 1. Contractor shall access the landfills through the main access gates. The front <br /> gate on Waverly Rd is the main access gate to the Foothill Landfill. The front <br /> gate on Harney Lane is the main access gate to the North County Landfill. <br /> ' 2. Access to some drilling locations will require the contractor to remove a <br /> section of barbed wire fence. All fence removed shall be re-constructed after <br /> well installation. <br /> ' 3. Access to wells SG-11 and SG-12 at the North County Landfill will be through <br /> the neighbor's property (Nestor Enterprises). Contractor shall cut fence to <br /> allow access into County property in the presence of the Engineer, and shall <br /> ' replace disturbed fence to a condition equal or better than that disturbed. <br /> Contractor shall not disturb any other portion of the Nestor property. <br /> K. MITIGATION AREA RESTRICTION AT NORTH COUNTY LANDFILL <br /> 1. Mitigation Area Restrictions apply to work at certain wells, as identified in the <br /> construction drawings, due to proximity to wetland areas. At wells subject to <br /> Mitigation Area Restrictions Contractor shall: <br /> a. Remove soil cuttings. Such soils shall be taken to the active landfill <br /> t face and placed as directed by the Landfill Site Foreman. <br /> b. Contain wash water contaminated with cement. Such wash water <br /> may be spread on road areas within the landfill sites as identified by <br /> ' the Landfill Site foreman. <br /> c. Place straw wattle continuously around the wells at a distance of 10 <br /> feet. Stake wattles four feet on center. <br /> 10-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.