My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2006_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 10 <br /> SPECIAL <br /> When hourly rates are listed, less than 30 minutes of operation <br /> shall be considered to be 1/2 hour of operation. <br /> When daily rates are listed, payment for 1/2 day will be made if the <br /> equipment is not used. If the equipment is used, payment will be <br /> made for the day. <br /> 10-1.06 OBSTRUCTIONS.--Attention is directed to Section 8-1.10, Utility <br /> and Non-Highway Facilities," and 15, "Existing Highway Facilities," of the Standard <br /> ' Specifications and these special provisions. <br /> The Contractor shall notify Underground Service Alert (USA) <br /> r (PH- 1-800-227-2600) at least two (2) working days prior to drilling. The Contractor <br /> shall verify overhead power line clearances for drill rigs access near well drilling <br /> locations at both sites. <br /> 10-1.07 DOCUMENTS ON SITE. -- The Contractor shall maintain a <br /> complete set of contract documents on site. Contract documents include the Contract, <br /> Addenda, Plans and Specifications. <br /> Subcontractor crews shall be in possession of contract documents <br /> relevant to their work, and shall produce such documents when requested by the <br /> Engineer. Failure of the subcontractor crews to produce contract documents will be <br /> justification for the Engineer to direct the cessation of work by the Contractor's crew at <br /> the Engineer's discretion. The cost for such cessation shall be born by the Contractor. <br /> Working days will not be suspended in the case of cessation due to lack of contract <br /> documents. <br /> 10-1.08 MEASUREMENT.—Separate measurement for payment will not <br /> be made for work or materials specified in this Section. <br /> 10-1.09 PAYMENT.--Separate payment will not be made for work or <br /> materials specified in this Section 10. Full compensation shall be considered as <br /> included in the prices paid for the various contract items of work of this project, and no <br /> additional compensation will be allowed or paid. <br /> NA2PerimLFGwe11s oaspecs\Sect 10 Const Details.doc <br /> 10-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.