My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2006_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 10 <br /> SPECIAL <br /> ' 10-1.02 STAKING.--Stakin shall conform to the provisions of Section <br /> 9 <br /> 5-1.07, "Lines and Grades," of the Standard Specifications and these special <br /> ' provisions, and to Section 01055 of the Technical Specifications. <br /> A. Control Stakes and Field Adjustments: <br /> The Count has staked the location of LFG migration monitoring wells, walkgates, and <br /> Y g g <br /> ' drive gates at both sites as shown on the construction drawings. The Contractor shall <br /> install LFG monitoring wells, walk gates and drive gates at the staked locations. The <br /> Engineer may adjust the location of LFG monitoring wells due to site conditions. <br /> 10-1.03 PROGRESS SCHEDULE.--Attention is directed to <br /> Section 8-1.04, "Progress Schedule," of the Standard Specifications and these special <br /> provisions. The Progress Schedule shall include, at a minimum, the following items: <br /> a. Number and description of drill rigs for the project <br /> ' b. Method of drilling and installation of LFG migration monitoring wells <br /> ' 10-1.04. Not Used <br /> 10-1.05 FORCE ACCOUNT.--Attention is directed to Sections 4-1.03, <br /> "Changes," and 9-1.03, "Force Account Payment," of the Standard Specifications and <br /> these special provisions. <br /> ' The contract item "force account" shall be restricted to work required for public <br /> convenience and minor engineering changes. <br /> ' 10-1.06 MEASUREMENT & PAYMENT.--Attention is directed to <br /> Section 9, "Measurement and Payment," of the Standard Specifications. <br /> ' (a) Amend Section 9-1.03A (3b), "Equipment not on the Work," of the <br /> Standard Specifications as follows: <br /> ' Delete paragraph 9-1.03A (3b) (5) and substitute the following- <br /> ' (5) The rental time to be paid for equipment shall be the time the <br /> equipment is in operation on the extra work. Rental rates paid shall <br /> be those listed in the current publication of the State of California <br /> Department of Transportation, entitled "Labor Surcharge and <br /> Equipment Rental Rates," at the time when extra work is <br /> performed. <br /> 1 <br /> 10-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.