My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2010_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 8:37:49 PM
Creation date
7/3/2020 10:44:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_5
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2010_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
597
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r= 4 SITE ACCESS <br />4.1 Main Entrance Road <br />The main entrance road currently runs from Waverly Road to the site <br />attendant house. Maintenance of this road will be the <br />responsibility of the County fcr the time that this road is in <br />service. <br />4.2 Internal Access Roads <br />The internal site access roads are to serve excavation operations, <br />maintenance operations and rerfor-aance of actual Landfill <br />operations by the Operatcr. The Ocerator is responsible for <br />maintaining these roads to a level acceptable to the County for the <br />type of traffic use employed. Following are the general standards <br />for the roads. <br />4.3 Excavation haul roads <br />These roads are to be ccnstructed by the Operator using appropriate <br />equipment to permit safe conduct of landfill scrapers and other <br />heavy equipment. The design of the roads, including the width, <br />slope, materials, and location will be performed by the CDPW. The <br />goal of the road design by the County will be to minimize haul <br />costs and distances, segregate haul operational traffic from other <br />site traffic, and provide for site operations during inclement <br />weather. The County may alter the design of access roads as <br />needed. <br />4.4 Active area access road <br />4.-4.1 Fill Areas Above Surrounding Natural Terrain <br />The Operator shall be responsible for maintaining the access road <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.