Laserfiche WebLink
"s <br />4.5 Winter Roads and Pads <br />The County will prepare a winter plan by July 31 of each year <br />showing the area proposed for disposal, location of winter roads <br />and unloading pads, working face orientation, and site drainage. <br />f <br />The reouirements for winter planning are in Section 9. The winter <br />roads and pads shall be constructed and surfaced by the Operator by <br />August 31 of .each year to provide safe travel to for site users and <br />Landfill operational equipment. This shall generally consists of <br />applying gravel, grading and compaction to support traffic and <br />promote drainage. <br />The _County may require that winter pads or access roads be chip <br />sealed or paved. Such chip sealing or paving shall be engineered <br />and constr-acted by the County. <br />4.6 Roadway Drainage <br />The roadways shall be constructed by the Operator to promote <br />® drainage away from the roadway. This drainage shall be to roadside <br />ditches, when appropriate, and shall not direct water into areas of <br />exposed waste or conflict with the interim drainage methods for <br />disposal areas. <br />4.7 AUTHORIZED ACCESS <br />Access to the Landfill area shall be limited to: <br />* the Operator operating personnel, <br />* CDPW staff or its agents, <br />* site disposal users, <br />* county inspection personnel; <br />* regulatory agency staff as required by law, and <br />* contractors authorized by either the Operator or the CDPW <br />to perform site work or inspections. <br />This access shall occur only during hours approved by the CDPW for <br />normal operations. Access by other parties or during other hours <br />must be approved by the CDPW. <br />13 <br />_k <br />