My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2011_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:37 PM
Creation date
7/3/2020 10:44:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2011_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACT Analysis Data for Foothill Landfill <br /> Control Device Name: SulfaTreat System <br /> Control Device Description: SulfaTreat for reduction of TRS as 1-12S to 10 PPMV from 150 PPM <br /> Engine Emissions sox _y <br /> IQAt= 2 En Ines t <br /> Guaranteed Uncontrolled my 15%02 150 6.18 <br /> Est.Controlled my 15%02 10 0.41 <br /> Percent reduction 93% 5.77 11.54 <br /> Flare Emissions SOx Sox tov Flare tov <br /> Guaranteed Uncontrolled my 15%02 150 1.23 <br /> Est.Controlled my 15%02 10 0.08 <br /> Percent reduction 93% 1.15 1 2.30 <br /> Ca it I Cost Ifor SulfaTreat System Percent for Cost for <br /> Descri tion Capital Cost SOx Reduction SOx Reduction Comments <br /> SulfaTreat Material First Fill of Media $ 56,160 100% $ 56,160 Mi SWACO Estimate <br /> SulfaTreat System $ 260,000 100% $ 260,000 Mi SWACO Estimate' <br /> Transportation $ 15,800 100% $ 15,800 Mi SWACO Estimate' <br /> Sulfa Treat Installation $ 125,000 100% $ 125,000 SCS Estimate <br /> Permitting and Design $ 50,000 100% $ 50,000 SCS Estimate <br /> Sales Taxes 8.75% $ 44,359 $ 42,977 For Purchase of Major Equi menta <br /> Contingency 10% $ 55,132 $ 54,994 Based on 10%contingency <br /> Total Ca ital Cost $ 604,930 <br /> Equivalent Annual Control Equipment Ca ital Cost*j 1 $ 98,449.60 <br /> *SJVAPCD BACT Policy Section X(A)(1)1 <br /> Annual Operating Cost(for SulfaTreat System) Percent for Cost for <br /> and Estimated Overhaul/M ial Re lacemen Cost Annual Cost SOx Reduction SOx Reduction Comments <br /> Media Purchase Cost $ 112,320 100% $ 112,320 Mi SWACO Estimate' <br /> Disposal Cost $ 31,962 100% $ 31,962 Mi SWACO Estimate/SCS Estimate <br /> Transportation $ 10,800 100% $ 10,800 SCS Estimate <br /> Labor $ 18,000 100% $ 18,000 SCS Estimate <br /> Maintenance $ 43,115 100% $ 43,115 SCS Estimate <br /> Vessel Repair Replacement Costs $ 15,600 100% $ 15,600 Mi SWACO Estimate8 <br /> Miscellaneous $ 5,751 100% $ 5,751 SCS Estimate9 <br /> Contingency 10% $ 21,620 $ 21,620 Based on 10%contingency° <br /> Total Annual Operating and Replacement Cost $ 259,168 <br /> Total Annual Cost $ 357,617.43 <br /> Cost Effectiveness of SulfraTreat System: <br /> Cost effectiveness($/ton) = Annual cost$/ ear) District Standard Emissions-Emissions(w/tech feas BACT ton/ ear <br /> Engine Cost Effectiveness $ 357,617.43 /year 11.54 ton/ ear $30,989.38 /ton <br /> SJVAPCD CO Cost Effectiveness $18,300/ton Not Cost Effective <br /> Flare Cost Effectiveness $ 357,617.43 /year 2.30 ton/ ear $155,485.84 /ton <br /> SJVAPCD CO Cost Effectiveness $18,300/ton Not Cost Effective <br />
The URL can be used to link to this page
Your browser does not support the video tag.