My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2011_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:37 PM
Creation date
7/3/2020 10:44:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2011_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notes <br /> Estimates for capital costs for initial SulfaTreat purchase and installation are based on estimates obtained from Mi SWACO <br /> from their experience with the SulfaTreat technology. <br /> 2 The design,permitting,and startup costs for the catalyst systems were estimates made by SCS Engineers from recent experience. <br /> 3 Applied at 8.75%rate for major equipment purchases <br /> 4 A 10%contingency was applied and considered reasonable for the uncertainties with this project <br /> 5 Mi SWACO estimate assuming$0.15/lb cleanout and SCS estimates$350/ton or$0.175/lb disposal cost as hazardous waste. <br /> 6 SCS estimate based on$9,000 per changeout. Assumed will have 1 changeout per year for each vessel. <br /> 7 SCS estimate 5%of capital costs,less media <br /> 8 Mi SWACO estimate using 50%vessel repair/replacement($130,000 per vessel)every 10 years plus 20%installation costs <br /> 9 SCS estimates 0.5%of capital costs,less media plus$500 equipment rental, 1 time per year <br />
The URL can be used to link to this page
Your browser does not support the video tag.