My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2011_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:37 PM
Creation date
7/3/2020 10:44:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2011_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■r <br /> SACT Analysis Data for Foothill Landfill <br /> Control Device Name: Iron Sponge System <br /> Control Device Description: Iron Sponge for reduction of 1-12S to 10 PPMV from 150 PPM <br /> Ennine Emissions Sox Sox tov 2 Engines t <br /> Guaranteed Uncontrolled my 15%02 150 6.18 <br /> Est.Controlled my 15%02 10 0.41 <br /> Percent reduction 93% 5.77 11.54 <br /> Flare Emissions Sox SOx tov Flare t <br /> Guaranteed Uncontrolled my 15%02 150 1.23 <br /> Est.Controlled my 15%02 10 0.08 <br /> Percent reductionj 93% 1.15 2.30 <br /> Ca ital Cost for Iron S on e System Percent for Cost for <br /> Descri tion Ca ital Cost SOx Reduction SOx Reduction Comments <br /> Iron Sponge Material First Fill of Media $ 30,862 100% $ 30,862 MVLLC Company Estimate' <br /> Iron Sponge S stem $ 250,000 100% $ 250,000 MVLLC Company Estimate' <br /> Iron Sponge Su ort Equipment $ 100,000 100% $ 100,000 MVLLC Company Estimate' <br /> Iron Sponge Installation $ 125,000 100% $ 125,000 SCS Estimate <br /> Permitting and Design $ 50,000 100% $ 50,000 SCS Estimate2 <br /> Sales Taxes 8.75% $ 48,638 $ 48,638 For Purchase of Major E ui menta <br /> Contingency 10% $ 60,450 $ 60,450 Based on 10%contin enc ° <br /> Total Capital Cost $ 664,950 <br /> Equivalent Annual Control Equipment Ca ital Cost $ 108,217.54 <br /> "SJVAPCD BACT Policy Section X(A)(1)1 +- I I <br /> Annual Operating Cost(for Iron Sponge System) Percent for Cost foe <br /> and Estimated Overhaul/Medial Re lacement Cost Annual Cost SOx Reduction SOx Reduction Comments <br /> Media Purchase Cost $ 61,724 100% $ 61,724 MVLLC Company Estimate' <br /> Disposal Cost $ 69,202 100% $ 69,202 MVLLC Com an /SCS Estimates <br /> Trans ortation $ 25,100 100% $ 25,100 SCS Estimate6 <br /> Labor $ 18,000 100% $ 18,000 SCS Estimate6 <br /> Maintenance $ 33,247 100% $ 33,247 SCS Estimate' <br /> Power $ 2,409 100% $ 2,409 SCS Estimate8 <br /> Contingency 10% $ 20,727 $ 20,727 Based on 10%contin enc 4 <br /> Total Annual 02erating and Replacement Cost $ 230,410 <br /> Total Annual Cost $ 338,627.49 <br /> Cost Effectiveness of LO-CATS stem: <br /> Cost effectiveness $/ton = Annual cost$/ ear / District Standard Emissions-Emissions(w/tech feas BACT ton/ ear <br /> En ine Cost Effectiveness $ 338,627.49 /year 11.54 ton/ ear $29,353.98 /ton <br /> SJVAPCD CO Cost Effectiveness $18,300/ton Not Cost Effective <br /> Flare Cost Effectiveness $ 338,627.49 /year 2.30 ton/ ear $147,485.84 /ton <br /> SJVAPCD CO Cost Effectiveness $18,300/ton Not Cost Effective <br />
The URL can be used to link to this page
Your browser does not support the video tag.