Laserfiche WebLink
Notes <br /> 1 Estimates for capital costs for initial LO-CAT system purchase and installation are based on estimates obtained from <br /> SCS Engineers from previous estimates from Merichem <br /> 2 The design,permitting,and startup costs for the catalyst systems were estimates made by SCS Engineers from recent experience <br /> s Applied at 8.75%rate for major equipment purchases <br /> 4 A 10%contingency was applied and considered reasonable for the uncertainties with this project <br /> 5 SCS estimate assuming$0.15/Ib cleanout plus disposal costs due to water content <br /> 6 SCS estimate assumes 4 hours of operating labor per day per 5 day work week <br /> SCS estimate 5%of capital costs <br /> $SCS estimates 18.1 kW required at$0.11 kW-hr for a full year(8,760 hours),50%contingency also included <br />