My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:49 PM
Creation date
7/3/2020 10:46:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2015
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As-Built CQA Report for the Construction of Area 2A at the Foothill Sanitary Landfill <br /> San Joaquin County,California <br /> • 6.5.3 HDPE Geomembrane...................................................................................................25 <br /> 6.5.4 8-oz Geotextile..............................................................................................................28 <br /> 6.5.5 Drainage Geocomposite................................................................................................28 <br /> 6.5.6 Sacrificial Geomembrane..............................................................................................29 <br /> 7.0 LEACHATE COLLECTION AND REMOVAL SYSTEM.......................................................................30 <br /> 7.1 GENERAL....................................................................................................................................30 <br /> 7.2 PIPING AND LCRS GRANULAR DRAINAGE MATERIAL AND SUMP GRAVEL PLACEMENT 30 <br /> 7.3 CQA TESTING OF LCRS AND SUMP GRAVEL MATERIALS.....................................................31 <br /> 8.0 OPERATIONS SOIL LAYER....................................................................................................................33 <br /> 8.1 GENERAL....................................................................................................................................33 <br /> 8.2 PLACEMENT ..............................................................................................................................33 <br /> 9.0 LEAK LOCATION SURVEY.....................................................................................................................34 <br /> 10.0 MISCELLANEOUS CONSTRUCTION....................................................................................................35 <br /> 10.1 GENERAL....................................................................................................................................35 <br /> 10.2ANCHOR TRENCH BACKFILL...................................................................................................35 <br /> 10.3 PERIMETER LINER TERMINATION BERMS............................................................................35 <br /> 10AACCESSROAD............................................................................................................................35 <br /> 10.5 DRAINAGE STRUCTURES .........................................................................................................36 <br /> 10.6LEACHATE COLLECTION PIPING, PUMP AND CONTROLS....................................................36 <br /> • 11.0 CERTIFICATION.......................................................................................................................................38 <br /> List of Tables <br /> Table 1 Summary of Field Compaction Test Results- Earthfill <br /> Table 2 Summary of Field Compaction Test Results- Foundation Layer Soil <br /> Table 3 Summary of Field Compaction Test Results -Trench Backfill <br /> Table 4 Summary of Laboratory Test Results-Granular Drainage Material <br /> Table 5 Summary of Laboratory Test Results-Coarse Gravel <br /> Table 6 Summary of Laboratory Test Results-Operations Layer Soil <br /> Table 7 Summary of Conformance Test Results for GCL <br /> Table 8 Summary of Conformance Test Results for 60-mil DST HDPE Geomembrane <br /> Table 9 Summary of Conformance Test Results for 8-oz Geotextile <br /> Table 10 Summary of Conformance Test Results for Geocomposite <br /> Table 11 60-mil HDPE Geomembrane Seam Destructive Testing Summary <br /> Table 12 Interface Shear Test Configuration (Series 1-3 - Individual Interface) <br /> Table 13 Interface Shear Test Configuration (Series 4 and 5 -Sandwich Test) <br /> Table 14 Summary of Interface Shear Test Results <br /> • <br /> PA14 Projects114-101(SJCDPW North County and Foothillff oothill CQAIRepoOkFinal ReportToothill CQA Rport-Final.docx <br /> ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.