Laserfiche WebLink
As-Built CQA Report for the Construction of Area 2A at the Foothill Sanitary Landfill <br /> San Joaquin County,California <br /> • List of Figures <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Limits of Liner Certification Area <br /> Figure 4 Liner System Details <br /> Figure 5 Earthfill, Anchor Trench, Forced Main and Granular Backfill Density Test <br /> Locations <br /> Figure 6 Foundation Layer Density Test Locations <br /> List of Appendices <br /> Appendix A- Field Daily Reports <br /> Appendix B - Select Construction Photographs <br /> Appendix C - Design and Specification Variances <br /> Appendix CA Gradation and Roundness of LCRS Granular Drainage Material <br /> Appendix C.2 Interface Shear Strength <br /> Appendix C.3 Operations Layer Particle Size <br /> • Appendix D- Construction Drawings,As-Built Survey Data and Panel Layouts <br /> Appendix D.1 Construction Drawings <br /> Appendix D.2 As-Built Survey Data Showing Soil Layer Thicknesses <br /> Appendix D.3 As-Built Panel Layouts for HDPE Geomembrane and GCL <br /> Appendix E - Earthworks Laboratory Test Results and Subgrade Acceptance Forms <br /> Appendix E.1 Earthfill- Laboratory Test Results <br /> Appendix E.2 Foundation Layer Soil- Laboratory Test Results <br /> Appendix E.3 Trench Backfill and Granular Backfill- Laboratory Test Results <br /> Appendix EA LCRS Granular Drainage Material- Laboratory Test Results <br /> Appendix E.5 Coarse Gravel-Laboratory Test Results <br /> Appendix E.6 Operations Layer Soil- Laboratory Test Results <br /> Appendix E.7 CLSM - Laboratory Test Results <br /> Appendix E.8 Subgrade Acceptance Forms <br /> • <br /> PA14 Projects114-101(SJCDPW North County and Foothill)IFoothill CQAIReport\Final ReportWoothill CQA Rport-Final.docx <br /> iii <br />