My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2016_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2016_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 3:36:38 PM
Creation date
7/3/2020 10:46:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2016_1
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2016_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRACK MOUNTED DRILL RIGS <br /> OPERATIONS AND MAINTENANCE MANUAL <br /> In this manual the four most important issues concerning the drilling division daily activities will <br /> be covered. The activities are Mobilization, Drilling, Completion, and Demobilization. This <br /> manual breaks down the activities to further explain important operating and maintenance issues. <br /> At the end of the manual we have inserted the rigs safety sheets from their original <br /> manuals these sheets need to be reviewed so that you understand the limits of your machine <br /> while operating them. <br /> This manual will refresh the drilling supervisor's thoughts before beginning the next project with <br /> his crew. This manual is in the accordance with, but does not supercede, the Site Specific Health <br /> & Safety Manual. <br /> The work performed under our contracts fall under OSHA Level D protection (steel toed boots, <br /> hard hats, safety glasses, gloves, and hearing protection). <br /> Attached is an acknowledgment sign-off-sheet that states that the driller has read and has passed <br /> the information along to his crewmembers. The driller and his crewmembers must sign off on <br /> the acknowledgment sheet. <br /> The signatures will confirm the importance of equipment maintenance and project operations are <br /> understood. <br /> Mobilization: <br /> Staging Area: <br /> Talk to the client to collectively come to an agreement on the Staging Area. The location should <br /> be a flat area and free of traffic. If the area is close to the access road then the working area <br /> should be coned and flagged off. This area includes the job trailer, well pipe, and fusing area. <br /> The staging area should be neat at all times (no pipe shavings and trash) <br /> Drill Rig Arrival: <br /> The drill rig should be inspected before off loading the machine. If there are any damaged <br /> valves or switches due to poor chain location, then is the time to make claim that the trucking <br /> company is at fault. <br />
The URL can be used to link to this page
Your browser does not support the video tag.