Laserfiche WebLink
0 <br /> G <br /> Straight Bore <br /> started if the <br /> mast moves <br /> then the down <br /> pressure is on <br /> the inside of <br /> the kelly bars <br /> Q <br /> 6) All cuttings will be kept damp and covered. <br /> 7) Laboratory testing of ACM is not included. <br /> DRILLING: <br /> Travel to Location <br /> Once the well locations have been verified track the rig to the first location. While tracking to <br /> the location the truck accompanying him should be a MINIMUM OF 50 FEET AWAY even <br /> when the rig is set up at the drilling location. The driller will place three cones behind the drill <br /> rig as shown below. When travelling within the work area you should avoid maneuvering with <br /> the vertical mast and bend the mast backwards by approximately 60 degrees. <br /> t <br /> I <br /> 0 <br /> 10 50 FEET OCA 0 <br />