Laserfiche WebLink
DAILY EXCAVATION INSPECTION FORM <br /> Name of Excavation Competent Person: <br /> Date of Inspection: <br /> Excavation/Trench location: <br /> Depth: Width: Date Opened: <br /> Soil classification: ❑ A ❑ B ❑ C <br /> Indicate, by marking the test below, how the classification was made. <br /> Manual test(s) Cohesive Cohesive Granular <br /> unfissured fissured <br /> a) plasticity <br /> b) dry strength <br /> c) thumb penetration <br /> d) pocket penetrometer <br /> e) other <br /> Visual test(s) Do as many as possible <br /> Cohesive Soil Granular Soil <br /> a) Spoil pile Remains in clumps Breaks up easily <br /> b) Trench Side Stands vertical for over 2 hours Sloughs into <br /> trench <br /> The excavation is properly(circle one): <br /> Shored (indicate the type of shoring) ❑ closed ❑ open ❑ wood ❑ metal <br /> Sloped/benched (indicate the slope) ❑ vertical sides ❑ 3/4:1 ❑ 1:1 ❑ 1 1/2: 1 ❑ 2:1 <br /> Excavation Checklist: Morning Mid-Day <br /> Afternoon <br /> Time: <br /> Weather: <br /> Was atmospheric testing required? Dyes ❑no ❑yes ❑no ❑yes ❑no <br /> Was atmospheric testing done? Dyes [-]no Dyes ❑no Dyes ❑no <br /> Is the spoil pile back T from the edge? Dyes ❑no ❑yes ❑no ❑yes ❑no <br /> Have surface encumbrances been removed? Dyes ❑no Dyes ❑no ❑yes ❑no <br /> Are there any signs of sloughing or cave-in? Dyes [-]no Dyes ❑no Dyes ❑no <br /> Is there water accumulation in the bottom? Dyes ❑no ❑yes ❑no Dyes ❑no <br /> Are there vibration sources near the excavation? Dyes ❑no Dyes ❑no ❑yes ❑no <br /> Is there adequate access/egress(ladder, ramp, etc.) Dyes ❑no ❑yes [:]no Dyes ❑no <br /> Has the soil been disturbed previously? Dyes Ono ❑yes ❑no [-]yes ❑no <br /> Sides Dyes ❑no Dyes [-]no [-]yes ❑no <br /> Top ❑yes [-]no Dyes ❑no Dyes [-]no <br /> If the excavation is over 20 feet deep, have engineering <br /> designs been documented and complied with? ❑ es Ono Dyes ❑no Dyes ❑no <br />