Laserfiche WebLink
GeoSyntec Consultants <br />Table 5-1 <br />Estimated Partial Final Closure <br />And Post -Closure Maintenance Costs <br />1999 Dollars <br />WMU B, Forward Landfill <br />Estimated <br />Unit Cost <br />Estimated Total <br />Item <br />Quantity <br />($) <br />Cost ($) <br />Subgrade preparation; Interim hay/straw placement and <br />18.8 Acres <br />N/A <br />Forward will perform work <br />vegetation <br />Regrade and flatten south slope to 2H:1 V <br />-2 Acres <br />N/A <br />Forward will perform work <br />Check existing foundation layer thickness; Place 2 -ft thick <br />-6 Acres <br />N/A <br />Forward will perform work <br />foundation layer/intermediate soil cover as required. <br />Place 2 -ft thick foundation layer over new 31LIV slopes <br />42,150 cy <br />N/A <br />Forward will 2erform work <br />1 -ft Admixed Com acted Clay Liner <br />30,350 c <br />$151cy <br />$455,250 <br />Geocom osite Drains a Layer <br />210,000 sf <br />$0.50/sf <br />$105,000 <br />1 -ft Vegetative Layer <br />31,730 c <br />$6/c <br />$190,380 <br />Hydroseeding <br />18.8 acres <br />$1,500/acre <br />$28,200 <br />2 -in. organic layer over hydroseedinE <br />5,060 c <br />$8/cy <br />$40,450 <br />24 -in dia. corrugated HDPE 2ipe <br />2,000 ft <br />$13.05/ft <br />$26,100 <br />18 -in dia. corrugated HDPE pi2e <br />1,785 ft <br />$8.90/ft <br />$15,900 <br />12 -in dia. corrugated HDPE pipe <br />780 ft <br />$4.65/ft <br />$3,600 <br />Pie elacementfbackfill (4 -ft wide x 5 -ft deep trench) <br />2,700 linear ft <br />$10/c <br />$20,000 <br />Rock enerEy dissipaters <br />400 sf <br />$8/sf <br />$3,200 <br />Flared end sections <br />13 <br />$200/ea <br />$2,600 <br />Catch basins <br />10 <br />$10,000 <br />Pipe anchorage assemblies <br />20 <br />$2,000 <br />Develop construction drawings, specifications, and bid <br />1 <br />$50,000 <br />package <br />Construction management/CQA Inspection and testing <br />1 <br />$100,000 <br />activities <br />E$5,OOO/yr <br />WMUB Partial Final Closure Subtotal <br />$1,052,700 <br />Final cover maintenance <br />30 r <br />$150,000 <br />Drains e system maintenance <br />30 r <br />$150,000 <br />Leachate control maintenance <br />30 yr <br />$15,000/yr <br />$450,000 <br />Landfill gas monitoring <br />30 yr <br />$10,000/ r <br />$300,000 <br />Groundwater and vadose zone monitoring <br />30 yr <br />$50,000/yr <br />$1,500,000 <br />Site security <br />30 yr <br />$10,000/ r <br />$300,000 <br />Subtotal <br />$2,850,000 <br />WMU B, Post -Closure Maintenance Subtotal <br />17% <br />$2,850,000 <br />$484,500 <br />Partial Final Closure Subtotal <br />$1,052,700 <br />Post -Closure Maintenance Subtotal <br />$484,500 <br />20% Contin enc Eer §21820, Title 27 <br />$307,400 <br />Total Estimated Cost (in 1999 Dollars) <br />$1,844,600 <br />J:\ALLIED\FORWARD\CLOSUREPLAN\REPORT <br />5-2 <br />99.11.30 <br />