Laserfiche WebLink
0 GeoSyntec Consultants <br />5. PARTIAL <br />CLOSURE POST-CLOSUREMAINTENANCJ <br />COST ESTMATE <br />The estimated partial final closure costs for WMU B are summarized in Table 5-1. <br />A closure bond has been submitted to the CIWMB for payment assurance for the <br />closure. The post -closure maintenance costs for the entire landfill [CH2M HILL, 1994] <br />have been reduced per the fraction of the total landfill area covered by the WMU B <br />closure area (approximately 17%). Potential landfill gas control construction and <br />maintenance costs have not been included in the cost estimate. Sections §21769, 21820, <br />and 21840 of Title 27, CCR were followed during the preparation of the cost estimate. <br />0 J:\ALLIED\FORWARD\CLOSUREPLAN\REPORT 5-1 99.11.30 <br />