My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU D-99 Construction September 1999 <br /> Forward Landfill Job No.986011.02 <br /> by roll number. Information regarding the roll number, lot number, and batch of <br /> the material was recorded. A copy of Vector's log of geotextile received has <br /> been included within Appendix M. Manufacturer's certifications are also included <br /> in Appendix M. <br /> 5.6.2 Geotextile Deployment <br /> The panel deployment procedure was observed and documented by <br /> Vector's CQA Monitor. The CQA Monitor verified that the geotextile placement <br /> was completed in accordance with the CQA plan and specifications. Seam <br /> overlap, sewing, tie-ins, and other manufacturer's written guidelines were <br /> followed. All materials were checked for defects during deployment and all holes <br /> or tears were identified and repaired prior to placement of the cover materials. <br /> 5.7 Geonet Installation <br /> A geonet was placed above the secondary HDPE liner as a leachate detection <br /> layer within the Class II Leachate Impoundment. As the material was delivered and <br /> deployed, Vector's CQA Monitor conducted testing and observations to ensure <br /> compliance with the specifications. <br /> 5.7.1 Geonet Factory Quality Control <br /> Upon arrival by truck shipment, the unloading and storage of the geonet <br /> rolls were observed by Vector's CQA Monitor. Each roll was logged in by roll <br /> number and crossed checked with the manufacturer's certification. Information <br /> regarding the roll number, and lot number was recorded. A copy of Vector's log <br /> of geonet received and the manufacturer's certifications have been included <br /> within Appendix L. In accordance with the specifications, no conformance <br /> testing was conducted on the geonet. <br /> 5.7.2 Geonet Deployment <br /> The panel deployment procedure was observed and documented by <br /> Ol Vector's CQA Monitor. The Monitor verified that the conditions of the CQA plan <br /> Vector Engineering, Inc. - 12438 Loma Rica Dr., #C - Grass Valley, CA - (530)272-2448 <br /> -18- <br />
The URL can be used to link to this page
Your browser does not support the video tag.