My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:48:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
during active operations as required under 27 CCR, Sections 20921 through <br /> 20939. q f^cIudes the e-ast to--repla^e 25 nevem+ of the gas migration mnniteri ri rT <br /> pFebes dulcing final stage of Fe (Stage Vill <br /> t-f��>,,,�,��te�-�-Qr-Eloeu,z-rQt�g�-�)-eF-a- lesser pertien of thewe: <br /> 1.8.9 Groundwater Monitoring System <br /> No costs are associated with this category since additional groundwater monitoring <br /> facilities are not proposed for the site at closure. <br /> 1.8.10 Engineering Design <br /> This category includes costs for the preparation of construction level engineering <br /> design plans and specifications for bid purposes. This cost is assumed to be 215 <br /> percent of the construction cost. <br /> 1.8.11 Construction Management <br /> The construction management cost for the FL is based on the closure construction <br /> period. This cost is assumed to be 4 percent of the construction cost. <br /> 1.8.12 Partial Final Closure and Post-Closure Maintenance Plan Preparation <br /> This category covers the cost to prepare a Partial Final Closure Plan for the Stage <br /> VIII Closure area. <br /> 1.8.13 Contingency <br /> A 20 percent contingency factor has been added to the construction cost estimate. <br /> 1.9 Post-Closure Maintenance Cost Estimate <br /> The post-closure maintenance cost estimate previously prepared is not affected by <br /> the proposed changes included in this-42SRGAAPIR mendment. The post-closure <br /> cost estimate is presented in Amendment No. 4 of the 2002 PCPCMP and reflects <br /> 2008 costs. The operator will initiate post-closure maintenance activities as the <br /> staged closure of the FL is implemented. The operator's understanding is that a <br /> minimum of the last thirty (30) years of post-closure maintenance must be funded. <br /> Therefore, the ongoing post-closure obligation under state law will continue for a <br /> minimum of 30 years after the Stage VIII closure area is completed. <br /> 1.10 Demonstration of Financial Assurance <br /> Closure and Post-Closure Maintenance Fund <br /> In accordance with 27 CCR, Chapter 6 and 40 CFR, Subpart G, an operator must <br /> demonstrate financial assurance for the proper closure, post-closure maintenance <br /> and corrective action for reasonably foreseeable releases at a landfill. An Insurance <br /> 10 <br /> Forward Landfill-PCPCMP Amendment <br /> (Z:\PROJECTS\Allied Waste\1N81013 5 yr Review Plan\PCPCMP Amend 3 July 08\FinaICPRRevl.doc; <br /> Amendment No.3:713120 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.