My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2002_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2002_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:48:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2002_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2002_1.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closure Stages <br /> Stage I was split into two separate construction stages with Stage IA closed in <br /> 2006. The 2005 Partial Final Closure Plan provides the detailed information on the <br /> purpose and design of the Stage IA area. Staged closure of the FL will be <br /> conducted throughout the development of the landfill. Currently, it is anticipated <br /> that the Stage IB elesure area will be closed in the near-term based on refuse <br /> inflow rates-2j906. Subsequent staged closure dates are subject to future refuse <br /> inflow rates. Subsequent Partial Final Closure Plans will be submitted two years <br /> prior to reaching final fill elevations for each stage based on the refuse inflow rates <br /> for the preceding closure stage. In addition, Construction Quality Assurance (CQA), <br /> including closure certification, will be completed for each closure stage to verify <br /> proper final closure construction. <br /> Stage I <br /> Stage I is a 90.2-acre area as shown on Figure 1. This area includes the final fill <br /> slopes on the northern and southern portions of the landfill from the edge of the <br /> base liner system up to an elevation of 150 feet above mean sea level (AMSL). The <br /> Stage I area was/will be closed in two parts (Stage IA and IB). Stage IA was closed <br /> in 2006 in response to actions requested by the Regional Water Quality Control <br /> Board Central Valley Region. A partial final closure plan reflecting the closure of <br /> the Stage IA area was submitted and approved by the regulatory agencies in 2005. <br /> The Stage IA area consisted of 30.2 acres, therefore, the remaining 60.0 acres will <br /> be closed as part of the Stage IB closure. The closure volume estimates are based <br /> on waste fill up to an elevation 150 feet AMSL down to the master plan base <br /> grades. As part of this project, the area will be cleared and grubbed, as necessary, <br /> and the closure improvements constructed (e.g., final cover, permanent drainage, <br /> landfill gas system modification, etc.). It is anticipated that#W-,-Sta a IB area will <br /> be closed in the near-term depending on actual <br /> refuse inflow rates experienced over time, site conditions, and capital expenditure <br /> timin . <br /> Calculations and assumptions in support of the Stage I Closure Area site life <br /> estimate are included as Attachment 1. <br /> Stage II <br /> Stage II is a 5.6-acre area as shown on Figure 2. This area includes the final fill <br /> slopes along the southern slopes of the northern portion of the landfill up to an <br /> elevation of 150 feet AMSL. The closure volume estimates are based on waste fill <br /> up to an elevation of 150 feet AMSL down to master plan base grades. As part of <br /> this project, the area will be cleared and grubbed, as necessary, and the closure <br /> improvements constructed (e.g., final cover, permanent drainage, landfill gas <br /> system modification, etc. <br /> 3 <br /> Forward Landfill-PCPCMP Amendment <br /> (Z:\PROJECTS\Allied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\FinalCPRRevl.doc; <br /> Amendment No.3:7/3/2 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.