Laserfiche WebLink
Stage III <br /> Stage III is a 5.9-acre area as shown on Figure 3. This area includes the final fill <br /> slopes adjacent to Stage II along the southern slopes of the northern portion of the <br /> landfill to an elevation of 150 feet AMSL. The closure volume estimates are based <br /> on waste fill up to an elevation of 150 feet AMSL down to the master plan base <br /> grades. As part of this project, the area will be cleared and grubbed, as necessary, <br /> and the closure improvements constructed (e.g., final cover, permanent drainage, <br /> landfill gas system modification, etc.). <br /> Stage IV <br /> Stage IV is a 13.7-acre area as shown on Figure 4. This area includes the final fill <br /> slopes located between Stages III and I and along the northern slopes up to an <br /> elevation of 150 feet AMSL. The closure volume estimates are based on waste fill <br /> up to an elevation of 150 feet AMSL down to the master plan base grades. As part <br /> of this project, the area will be cleared and grubbed, as necessary, and the closure <br /> improvements constructed (e.g., final cover, permanent drainage, landfill gas <br /> system modification, etc.). <br /> Stage V <br /> Stage V is an 11.8-acre area as shown on Figure 5. This area includes final fill <br /> slopes along the northeast of the northern portion of the landfill up to an elevation <br /> of 90 feet AMSL. The closure volume estimates are based on the top of waste fill <br /> plan down to the master plan base grades. As part of this project, the area will be <br /> cleared and grubbed, as necessary, and the closure improvements constructed <br /> (e.g.,final cover, permanent drainage, landfill gas system modification, etc.). <br /> Stage VI <br /> Stage VI is a 20.7-acre area as shown on Figure 6. This area includes the northern <br /> final fill slopes adjacent to Stages I, IV, and V up to an elevation of 150 feet AMSL. <br /> The closure volume estimates are based on the top of waste fill plan down to the <br /> master plan base grades. As part of this project, the area will be cleared and <br /> grubbed, as necessary, and the closure improvements constructed (e.g., final <br /> cover, permanent drainage, landfill gas system modification, etc.). <br /> Stage VII <br /> Stage VII is a 166.7-acre area as shown on Figure 7. This area includes the entire <br /> deck area of the landfill up to an elevation of 200 feet AMSL. The closure volume <br /> estimates are based on a "flat deck" at an elevation of 200 feet AMSL down to the <br /> master plan base grades. As part of this project, the area will be cleared and <br /> grubbed, as necessary, and the closure improvements constructed (e.g., final <br /> cover, permanent drainage, landfill gas system modification, etc.). <br /> 4 <br /> Forward Landfill-PCPCMP Amendment <br /> (Z:\PROJECTS\Allied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\FinalCPRRevl.doc; <br /> Amendment No.3:7 ) <br />