Laserfiche WebLink
1 T <br /> Consolidated Forward Inc. Landfill Page 2 <br /> 2.0 MITIGATION MONITORING AND REPORTING PROGRAM CHECKLIST <br /> The Mitigation Monitoring and Reporting Program Checklist is proposed for monitoring <br /> the implementation of the mitigation measures contained in the Environmental Impact <br /> Report and previous EIRs on the project site (see Attachment 1 for a listing of mitigation <br /> measures). The County should implement the monitoring program as follows: <br /> • The Director of the San Joaquin County Community Development Department, <br /> or designee,should be responsible for coordination of the monitoring program <br /> including the monitoring checklist(Attachment 2). <br /> • Each responsible individual or agency will be responsible for determining <br /> whether the mitigation measures contained within the checklist have been <br /> complied with. Once all mitigation measures have been complied with,the <br /> responsible individual or agency should submit a Verification Report Form <br /> (Attachment 3),or similar form,and a completed checklist to the Director. <br /> • If a responsible individual or agency determines that a non-compliance has <br /> occurred,a written notice should be delivered to the Director describing the non- <br /> compliance and requiring compliance within a specified period of time. <br />