Laserfiche WebLink
1 <br />u <br />L <br />C <br />L <br />C <br />I I <br />0 <br />0 <br />0 <br />r <br />C <br />r <br />WMU ART -03 <br />Forward Landfill <br />May 2003 <br />Project No. 021605.02 <br />3.0 CONCLUSION <br />The construction of the WMU ART -03 was complete on April 24, 2003. Based on our <br />periodic site visits and testing during the construction of WMU ART -03, it is Vector's <br />professional opinion that the construction was completed in general accordance with <br />the project plans and specifications, CQA plan, and applicable regulations. <br />Vector Engineering, Inc.. 143E Spring Hill Drive a Grass Valley, CA a (530) 272-2448 <br />-9- <br />