Laserfiche WebLink
WMU ART -03 May 2003 <br />Forward Landfill Project No. 021605.02 <br />inch protective operations layer was placed over the geotextile. Vector's CQA Monitor <br />observed placement of the materials to ensure that the placement activities did not <br />damage the underlying geosynthetics. Upon completion of the protective soil layer, a <br />survey was completed by Centerliner Survey. A copy on the as -built survey has been <br />included as Exhibit 1. <br />r_ <br />r <br />11 <br />r <br />C <br />C <br />0 <br />i <br />L <br />r <br />L <br />1 <br />Vector Engineering, Inc. a 143E Spring Hill Drive a Grass Valley, CA a (530) 272-2448 <br />-8- <br />