Laserfiche WebLink
LJI <br />7 <br />LI <br />C' <br />C <br />i� <br />0 <br />WMU ART -03 May 2003 <br />Forward Landfill Project No. 021605.02 <br />2.0 WMU ART -03 CONSTRUCTION <br />During the construction of WMU ART -03, Guinn installed all the components of the <br />system. As this construction commenced, Vector performed site visits to conduct CQA <br />monitoring. The elements monitored by Vector and discussed within this section <br />include general fill, grading, geotextile placement, LCRS granular drainage layer <br />placement, and protective operations soil placement. <br />Project documentation was prepared by Vector as part of the CQA duties and consisted <br />of construction reports and a record of various test data sheets pertinent to the soil <br />components of the system. Copies of the original records are being maintained in the <br />Vector archive files in Grass Valley, California and can be made available to Allied or <br />the RWQCB upon request. <br />Construction reports detailing the work performed by Vector's CQA Monitor are <br />provided in Appendix A. Other CQA documentation with respect to test data and <br />observation sheets are discussed within each phase of the following sections. <br />2.1 Grading and General Fill <br />Guinn construction graded the existing surface to achieve the design grades and <br />constructed a perimeter berm around the WMU ART -03 area. The soil material used <br />for construction was obtained from an on-site borrow source and transported to the <br />WMU ART -03 area by scrapers, placed, and compacted. <br />In-place density tests were performed by Vectors CQA Monitor on the berm using a <br />nuclear density gauge. The material was tested at the specified frequency or greater <br />and found to meet the requirements of the specifications. Results of the testing <br />indicated that the material was placed to the minimum requirement of 85% relative <br />compaction. Summary of the field moisture/density testing is included in Table 1. <br />Vector Engineering, Inc.. 143E Spring Hill Drive . Grass Valley, CA . (530) 272-2448 <br />1672 <br />