Laserfiche WebLink
�1 <br />n <br />u <br />WMU ART -03 May 2003 <br />Forward Landfill Project No. 021605.02 <br />Vector performed site visits during construction of WMU ART -03 from March 26, 2003 <br />to April 24, 2003. The Project Manager for Allied Waste (Allied) was Mr. Lochlin Caffey. <br />The Landfill Operations Manager at the site was Mr. Butch Stefani. Construction <br />quality assurance was provided by Vector. The Lead CQA Monitor for Vector was <br />Denise Roussell. The project construction manager for Vector was Bryan Fritzler, P.E. <br />The Contractor for this project was Guinn Construction Company, of Bakersfield, <br />1 California. <br />0 <br />n <br />At the present time, WMU ART -03 at the Forward Landfill is complete and was installed <br />in general accordance with the plans and specifications, CQA Plan, and applicable <br />regulations. <br />Vector Engineering, Inc. a 143E Spring Hill Drive a Grass Valley, CA a (530) 272-2448 <br />-4- <br />